Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standq(og <br /> Section 6.15:Soil Erosion and Sedimentation Contro1268F <br /> (a) Any artificial watercourse (where the need is demonstrated) shall be <br /> designed considering soil type so that the velocity of flow is low enough <br /> to prevent accelerated erosion. <br /> (8) Buffer Area Requirements <br /> (a) Soil and pollutants carried over land, primarily from roads, trails, and/or <br /> land-disturbing activities, can be effectively trapped by leaving a <br /> relatively undisturbed strip of vegetation parallel and adjacent to the <br /> watercourse. <br /> (b) Properly managed overland u+cater flevvstormwater runoff can be directed <br /> into this buffer area in a manner that will reduce velocity and cause <br /> dispersion of the watQ stormwater runoff. Sediments carried by the water <br /> stormwater runoff will settle out as a result of this slowing and dispersion <br /> process. <br /> (c) The width of these buffer areas shall depend on the type of stream or <br /> drainage area and shall be determined as follows: <br /> (i) Creeks and tributaries - (i.e., permanent streams flowing directly <br /> into a water supply reservoir within University Lake, Cane Creek, <br /> and Upper Eno Watersheds and permanent streams flowing into <br /> such streams). <br /> a. Measure along a line running perpendicular to the edge <br /> of the floodplain 50 feet from the edge of the floodplain <br /> plus an additional distance equal to: 4 x slope x 100. <br /> b. If no floodplain has been demarcated, measure along a <br /> line running perpendicular to the center of the <br /> watercourse. Measure the 50 feet from the edge of the <br /> water. <br /> C. "Slope" is expressed as a percentage derived by dividing <br /> the rise in elevation between the floodplain boundary line <br /> (or centerline of the watercourse per above) and a point <br /> 100 feet from that point along the above described <br /> perpendicular line, by 100. <br /> (ii) Intermittent streams flowing into creeks and tributaries. <br /> a. Measure along a line running perpendicular to the <br /> centerline of the intermittent stream 50 feet from such <br /> stream centerline. <br /> (iii) Intermittent streams flowing directly into water supply reservoirs <br /> within University Lake, Cane Creek, and Upper Eno Watersheds. <br /> a. Measure along a line running perpendicular to the <br /> centerline of the intermittent stream 100 feet from such <br /> stream centerline. <br /> (i v) Intermittent streams flowing into streams which flow directly into <br /> water supply reservoirs within University Lake, Cane Creek, and <br /> Upper Eno Watersheds. <br /> a. Measure along a line running perpendicular to the <br /> centerline of the intermittent stream 50 feet from such <br /> stream centerlines. <br /> (v) Water supply reservoirs within University Lake, Cane Creek, and <br /> Upper Eno Watersheds. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.