Browse
Search
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 10-03-2022 Business Meeting
>
Agenda - 10-03-2022; 5-a - Unified Development Ordinance (UDO) Text Amendments – Erosion & Sedimentation Control (E&SC) and Stormwater Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 3:43:22 PM
Creation date
9/29/2022 3:33:58 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 3, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 10-03-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> (B) Issuance of a Special Use Permit does not negate the requirement for a Zoning <br /> Compliance Permit. <br /> (C) Issuance of a Zoning Compliance Permit does not establish a vested right to begin and <br /> complete construction or change the use/occupancy of a lot or building should <br /> regulations change subsequent to issuance of said permit. <br /> (D) Application for Zoning Compliance Permit shall specify the method of disposal of trees, <br /> limbs, stumps and construction debris associated with the permitted activity. Open <br /> burning of trees, limbs, stumps, and/or construction debris associated with the permitted <br /> activity is expressly prohibited. <br /> (E) No building, structure, or zoning lot for which a Zoning Compliance Permit has been <br /> issued shall be used or occupied until the Building Inspector has, after final inspection, <br /> issued a Certificate of Occupancy indicating compliance with all the provisions of this <br /> Ordinance. <br /> (F) No building, structure, or zoning lot for which a Zoning Compliance Permit has been <br /> issued shall be used or occupied until the Orange County Health Department has <br /> approved the water supply and sewage disposal systems serving that use. <br /> (G) Issuance of a Certificate of Occupancy by the Building Official or the approval of a water <br /> supply and sewage disposal system by the Health Department shall in no case be <br /> construed as waiving any provision of this Ordinance. <br /> �-i Zoning Compliance Permits shall become null and void after 18 months from the date of <br /> issuance if a building permit is not applied for or Land—Disturbing Activities5 are not <br /> commenced in accordance with the provisions of this Ordinance. <br /> {kyU Projects needing a Performance Guarantee <br /> eteMeatS_6shall abide by the provisions of Section 2.27 of this Ordinance.7 <br /> 2.4.3 Plot Plan Specifications <br /> (A) For development types requiring a plot plan rather than a site plan, the plot plan shall <br /> contain the following: <br /> (1) A scaled drawing denoting the length of all property lines, <br /> (2) A north arrow denoting the orientation of the lot and all proposed structures, <br /> (3) The location of all existing structures, driveways, and areas of impervious <br /> surface, <br /> (4) The location of the proposed structure(s) and distances from all property lines, <br /> (5) The location of the proposed driveway, <br /> (6) The location of the proposed septic system and proposed drain lines on the <br /> property, <br /> (7) The location of the proposed well, and <br /> (8) The location of any protected features on the property (i.e. stream buffers, flood <br /> plain, wetlands, etc), and <br /> (9) The location and dimensions of proposed parking areas. <br /> s "Land-Disturbing Activities"is correctly noted to match the Definitions section of this Ordinance—NOTE. "Land- <br /> Disturbing Activity/Activities" is integrated through the remainder of Article 2,where applicable. <br /> 6 Edit(s)based on Legal Sufficiency Review comments. <br /> 7 Cons i stent with Session Law 2019-79,and to avoid confusion,staff has created a central section addressingthe <br /> review/processing/acceptance of Performance Guarantees for projects involvingthe issuanceofa Zoning <br /> CompliancePermit or Subdivision final platapprova1. This is a s i mple reference to the new section deaIingwith <br /> Performance Guarantees. <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.