Browse
Search
2022-508-E-DEAPR-North Carolina Department of Agriculture and Consumer Services-Approval of NCADFP grant contract for matached funds in acquisition of conservation easement of Poteat family farm
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-508-E-DEAPR-North Carolina Department of Agriculture and Consumer Services-Approval of NCADFP grant contract for matached funds in acquisition of conservation easement of Poteat family farm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2022 5:50:45 PM
Creation date
9/28/2022 5:48:43 PM
Metadata
Fields
Template:
Contract
Date
9/28/2022
Contract Starting Date
9/28/2022
Contract Ending Date
9/28/2022
Contract Document Type
Contract
Amount
$189,645.15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 09/20 <br />IV.ADFP Trust Fund Monitoring Roles and Responsibilities <br />The ADFP Trust Fund monitoring methods include but are not limited to: <br />-Site visit: ADFP Trust Fund staff will make every effort to coordinate site visits with the grantee’s <br />monitoring schedule. ADFP Trust Fund staff will physically visit the easement. ADFP Trust Fund <br />staff will notify grantee and seek permission from landowner. The use of unmanned aerial <br />vehicles (UAVs), or drones, can supplement, but not replace in-person site visits. <br />-In-office: ADFP Trust Fund staff will review grantee monitoring reports and verify information. <br />Site visit protocol for ADFP Trust Fund staff: <br />-Contact grantee about site visit. Site visits will be coordinated to the extent possible with the <br />grantee’s annual monitoring visit schedule. <br />-Review completed “Grantee Monitoring Report – Perpetual or Term Easement.” <br />-Ensure landowner has been notified of site visit. <br />-Site visit can be conducted on foot or by vehicle. <br />-Compile documentation, including, but not limited to, photographs and data. <br />-Complete “ADFP Trust Fund Staff Monitoring Report – Perpetual or Term Easement.” <br />-Complete “ADFP Trust Fund Staff Incident Report – Perpetual or Term Easement” if necessary. <br />-Site visit will occur every three (3) years, unless otherwise directed. <br />In-office monitoring protocol for ADFP Trust Fund staff: <br />-Review completed “Grantee Monitoring Report – Perpetual or Term Easement.” <br />-Review the most current aerial photography data available (e.g. GIS via Multi-Hazard Threat <br />Database (MHTD), Google Earth, etc.). <br />-Complete “ADFP Trust Fund Staff In-Office Monitoring Report – Perpetual or Term Easement.” <br />-Complete “ADFP Trust Fund Staff Incident Report – Perpetual or Term Easement” if necessary. <br />-In-office monitoring will be completed in the years when site visits do not occur. <br />Incident report protocol for ADFP Trust Fund staff: <br />-The “ADFP Trust Fund Staff Incident Report – Perpetual or Term Easement” must be filed if a <br />grantee reports a violation or if ADFP Trust Fund staff discovers a violation during a site visit or <br />in-office monitoring. <br />-The completed “ADFP Trust Fund Staff Incident Report – Perpetual or Term Easement” will be <br />submitted to the Program Director for review, investigation, and/or corrective action. <br />-If necessary, the Program Director will meet with funding partners to discuss the findings of the <br />“ADFP Trust Fund Staff Incident Report – Perpetual or Term Easement.” <br />-If corrective action is warranted by the grantee, a conference call or meeting will be scheduled to <br />discuss the “ADFP Trust Fund Staff Incident Report – Perpetual or Term Easement” and results <br />of the initial review by the Program Director. <br />-If a violation has occurred, the grantee shall submit a Plan of Corrective Action to the ADFP Trust <br />Fund Staff within 30 days of the conference call or meeting. The Plan of Corrective Action must <br />be a comprehensive plan detailing the corrective action that will be taken to remedy all <br />violations and bring the project back in compliance. The ADFP Trust Fund staff will work with <br />grantee for correction. <br />-The appropriate NCDA&CS staff will formally notify grantee in writing of violation or potential <br />violation. <br />-If it is determined that a violation has occurred, a site visit will occur the subsequent year. The <br />monitoring schedule (site visit, in-office, site visit) will be reset each time a violation occurs. <br />DocuSign Envelope ID: 480AFBD4-654C-48FA-9CB8-F7C8D7E98DB2
The URL can be used to link to this page
Your browser does not support the video tag.