Orange County <br />Lake Orange Auxiliary Spillway Additional Services <br /> <br /> <br />Project 20P2101 9.02 / September 21, 2022 Page 4 Schnabel Engineering South, P.C. <br />Task 7 – Additional Auxiliary Spillway Investigations <br />Based on the direction of Christopher Sandt, PE, we completed an additional investigation of the auxiliary <br />spillway on July 6, 2022 and July 8, 2022 to obtain more information on the voids beneath the spillway <br />slab and behind the spillway side walls. This investigation included the following: <br /> <br />• Schnabel subcontracted with a local material testing and concrete coring company (ECS <br />Carolinas, LLP) to core as many 3-inch-diameter cores through the auxiliary spillway sidewalls <br />and slab as can be performed in one day. A representative from Schnabel was on-site to observe <br />the concrete coring and select coring locations. Eight cores were performed, five through the <br />sidewalls and three through the slab. The core hole locations are shown in Attachment 1. The <br />concrete cores were backfilled with a sack mix concrete grout upon completion. <br />• Schnabel performed a hand auger boring behind the right auxiliary spillway sidewall, north of the <br />auxiliary spillway and downstream of the weir to evaluate the depth of soil materials behind the <br />wall and obtain samples for laboratory testing for classification. The hand auger boring location is <br />shown on Attachment 1. The hand auger boring was advanced to refusal. <br />EXCLUSIONS <br />Services not specifically identified above are not included in the scope of services under this agreement. <br />The following services are not included in our proposed scope, but we can be provide a proposal for <br />these services upon request: <br /> <br />• Hydrologic and hydraulic analyses of the dam; <br />• Structural or stability analyses of the intake tower or auxiliary spillway; <br />• Preparation of breach inundation mapping and an Emergency Action Plan (EAP); <br />• Preparation of an Operation and Maintenance (O&M) Manual; <br />• Environmental studies or permitting; <br />• Surveys; and <br />• Attendance at meetings. <br />SCHEDULE <br />The field work detailed herein was performed on July 6, 2022 and July 8, 2022. The draft repair design <br />submittal is currently in progress. The final repair design submittal will be submitted up to 3 weeks after <br />comments are received on the draft submittal. <br />FEES <br />There is no change in fees based on the proposed modifications discussed herein. We understand the <br />remaining $31,280 of our modified contract value of $50,100 lump sum fee will be paid in equal <br />distributions upon completion of the Tasks 3, 4, 5, and 7. <br /> <br />The fees for work requested beyond the scope of services included herein will be based on our current <br />unit prices at the time the work is authorized or a negotiated lump sum. Services will be billed for the <br />lump sum fee upon completion of scope of services detailed herein and delivery of the deliverable. <br />DocuSign Envelope ID: 94DC2E6B-A091-44C2-A636-AEC6DE85AB37