Browse
Search
Agenda - 04-02-2002 - 8d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 04-02-2002
>
Agenda - 04-02-2002 - 8d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 8:55:53 AM
Creation date
8/29/2008 10:37:38 AM
Metadata
Fields
Template:
BOCC
Date
4/2/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes - 20020402
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Lucille Richardson page 1 <br /> 701 Shannon Drive <br /> Chapel Hill N.C. 27514 <br /> 2/14/02 <br /> EXTERIOR: <br /> 1. Install a drain basin on the right/rear side of house. The drain basin <br /> shall be a minimum of 24"x 24". The basin shall be constructed of <br /> thick black plastic. The drain basin will collect the water that is <br /> heading toward the house. Connect 6" solid drain tile to the basin <br /> and run the tile to the lower end of the lot. Plant grass seed and <br /> straw the disturbed area of the yard. The drain basin shall have a <br /> thick plastic grid to prevent debris from entering the drain lines. <br /> 2. Pressure wash the exterior. Paint the siding with flat exterior latex. <br /> Paint the exterior trim with semi-gloss exterior latex. Paint the shutters <br /> with semigloss latex paint. Paint to cover completely. <br /> 3. Remove the existing laundry room door. Install a six panel,metal <br /> insulated door unit with weather-stripping and threshold. Install a <br /> new lockset. The lockset is to be keyed the same as the front and <br /> side locksets. <br /> 4. Remove the gutter on the left front and replace the rotten gutter <br /> board. Reinstall the old gutter. <br /> MECHANICAL: <br /> 1. Install a propane gas split heat and air system. System to be 92% <br /> efficient. Install insulated ductwork. Make all mechanical and <br /> electrical connections. Install a service platform in the attic for the <br /> furnace. Build a catwalk from the disappearing stairway to the heat system. <br /> Install the condensing unit on concrete slab on the back side of the house. <br /> WINDOWS: <br /> 1. Remove the existing windows and storm windows. Install thermopane, <br /> vinyl replacement windows with one openable sash, screen and trim. <br />
The URL can be used to link to this page
Your browser does not support the video tag.