Orange County NC Website
Orange County Solid Waste Management <br />Well Construction 2022 <br />Specifications: well MW-301 <br />Total depth: 35 feet <br />Minimum borehole diameter 6 inches <br />Well pipe: 2-inch Schedule 40 PVC <br />Screen: 2-inches Schedule 40 PVC / 0.01-inch slots / 5 feet <br />Surface completion: concrete pad, monument (spike), steel or <br />aluminum protective casing, hinged lid, lockable, top casing ca. 2.5 feet <br />above ground surface <br />Geologic conditions: residual soil to ca. 7 feet / metamorphic rock <br />(phyllite) (see attached completion log MW-21D). <br />Special instructions. Special instructions. Driller to describe <br />recommended drilling procedures in proposal. <br />DocuSign Envelope ID: 367F9155-0B03-4C7F-9EF8-C3E2CE54CD84