Browse
Search
2022-493-E-Solid waste-Monitoring Well Construction 2022-OCSWM North Landfill-well construction 2022
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-493-E-Solid waste-Monitoring Well Construction 2022-OCSWM North Landfill-well construction 2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 1:43:45 PM
Creation date
9/26/2022 1:43:26 PM
Metadata
Fields
Template:
Contract
Date
9/23/2022
Contract Starting Date
9/23/2022
Contract Ending Date
9/23/2022
Contract Document Type
Contract
Amount
$32,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bruce Woody August 22, 2022 Page 2 of 3 <br /> <br />• Surveying services, to include: <br /> Survey west property boundary between Chapel Hill Transit and adjacent parcel to the west. <br /> Survey locations and elevations of both newly constructed monitoring wells. <br /> <br />• Well construction services: <br /> Construct two groundwater monitoring wells in general accordance with attached <br />specifications. We reserve the right to adjust specifications in response to unanticipated subsurface (geological) conditions. Drilling and well construction to be performed under contract between selected drilling firm and TRC. <br /> Observe and document drilling and well construction procedures. <br /> Obtain and describe soil / rock samples as encountered during drilling. <br /> <br />• Reporting services: <br /> Prepare well completion log for each monitoring well. <br /> Prepare accompanying narrative report, to be submitted to OCSWM and to NC-DEQ. <br /> <br />OWNER’S RESPONSIBILITIES. Owner shall provide access to TRC personnel to enter the landfill during <br />normal operating hours, or on other days or times as mutually agreed, to provide the field services associated with the tasks outlined above. Similarly, OCSWM shall arrange for access to TRC personnel and their subcontractors to the Town of Chapel Hill Transit site , to provide the field services associated with the tasks outlined above. COMPENSATION. Compensation to TRC for successfully providing the services outlined above shall be as follows: Task Fee Fee structure <br />well construction 2022 $32,000 lump sum <br /> <br />To authorize initiation of the proposed work, please sign and date this proposal, and return a copy to our <br />office. Meanwhile, if you have any questions, please contact me by e-mail (tlaughlin@trccompanies.com). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Attachments: specifications cc: Ms. Deborah Coakley (TRC - Environmental Services Division) Dr. Leonard Ford, Jr. (TRC - Environmental Services Division) Mr. Tyrus Clayton (TRC - Waste Resource Engineering) <br />DocuSign Envelope ID: 367F9155-0B03-4C7F-9EF8-C3E2CE54CD84
The URL can be used to link to this page
Your browser does not support the video tag.