Revised 06/21 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br />NORTH CAROLINA <br /> <br />______________________________________________________________________________________________________________ <br />Date: 9/15/2022 Project: Outside Plant Fiber Infrastructure Change Order No. 5 Department: IT <br /> Department Address: 131 W. Margaret Lane Project: 61370035-897086-30007 Contractor: NetPlanner Systems, Inc <br /> Contractor Address: 1229 Perry Road, Ste 108 Apex, NC 27502 Effective date of original contract: 3March2021 (2021-160) <br /> <br />This change order increases decreases the contract time by days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial <br />completion is: <br />_______________________________________________________________________________________________________________ <br /> <br />Full Description of Change: NNetPlanner is providing a solid rock price to drill solid rock and pull back the 2 x1.25” ducts. The price per <br />foot is <br />$51.50 and this includes all necessary equipment to perform a solid rock bore. The client will be billed accordingly for <br />rock footage per drill shot only. Example: if the shot is 500ft and 400 is dirt that part is cover under the previous quote <br />and this 100ft is to be billed at an additional per foot cost of $51.50 per foot and this is an adder to the main quote. <br />The additional cost is $ $5,150.00 <br /> <br />When bore path is determined to be rock, a soft or a solid rock adder will be allocated to overall cost accordingly. <br />NetPlanner reserves the right to bill that additional amount, upon mutual agreement price above before any rock is to <br />be drilled. <br /> <br />The rock drilling is a price per foot as an adder is $51.50 per foot. There is no way to know upfront how much solid <br />rock will be in the way. NetPlanner can do an open T&M of $51.50 per ft and then show how much solid rock total foot <br />at the end of the project. Or NetPlanner can do up to 390 ft $20,00.00 open PO. <br /> <br />Reason for Change: Rock is in the pathway of drilling to install conduit to hold Orange County Fiber. See Attachment A. <br />_______________________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 307,070.14 <br /> <br />Contract sum prior to this change order: $ 384,628.26 <br /> <br />Amount of this change order: $ 20,000.00 <br /> <br />Total sum of the contract including this change order: $ 404,628.26 <br /> <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, <br />project, services, or work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 15th day of September, 2022. <br />_______________________________ _____________________________ _____________________________ <br />DocuSign Envelope ID: F8F2DFD3-A67D-428A-9839-9A5ADA6F2B26