Browse
Search
Agenda - 09-13-2022; 2 - School Capital Needs Work Group Final Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 09-20-2022 Business Meeting
>
Agenda - 09-13-2022 Work Session
>
Agenda - 09-13-2022; 2 - School Capital Needs Work Group Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2022 3:17:05 PM
Creation date
9/8/2022 3:18:41 PM
Metadata
Fields
Template:
BOCC
Date
9/13/2022
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Agenda - 09-13-2022; Agenda for September 13, 2022 Work Session
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 09-20-2022 Business Meeting\Agenda - 09-13-2022 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Options for Structure Renovation or Replacem;%+_ <br /> Option One r Option Two Option 3 <br /> Repair, replacement or renovation Repair and renovation of long-range Repair and renovation of long-range <br /> of items, components or systems items that also bring the class size items that also bring the class size <br /> that are important to the health square footage of elementary square footage of elementary <br /> and safety of the students and classrooms to 1,200 sf and/or meet classrooms to 1,200 sf and/or meet <br /> staff and to sustain the overall future capacity needs and the future capacity needs and the <br /> operation of the facility. General Orange County School Building Orange County School Building <br /> maintenance and system service Standards of 585 students for Standards of 637 students for <br /> life upgrades. (state building code elementary schools. (OC standard at elementary schools. Utilize <br /> violations, health department 585 currently: New standard =517 sustainable approaches to extend <br /> violations, handicapped with class size changes) INTERIOR building life while reducing overall <br /> accessibility issues, removal of RENOVATIONS BUILDING maintenance and operation costs. <br /> hazardous material, security ADDITION AND SITE (DPI building size old standard= <br /> issues not being met by current IMPROVEMENT MECHANICAL 700 students/new standard with <br /> systems) SYSTEM UPGRADES MAJOR class size changes =637 students) <br /> BUILDING IMPROVEMENTS <br /> C-HMEL HILL- <br /> IWX11A %ISRI lll�\\�11���1►%/�\\\�1111� CIT�NOO <br />
The URL can be used to link to this page
Your browser does not support the video tag.