Browse
Search
Agenda - 09-13-2022; 2 - School Capital Needs Work Group Final Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 09-20-2022 Business Meeting
>
Agenda - 09-13-2022 Work Session
>
Agenda - 09-13-2022; 2 - School Capital Needs Work Group Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2022 3:17:05 PM
Creation date
9/8/2022 3:18:41 PM
Metadata
Fields
Template:
BOCC
Date
9/13/2022
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Agenda - 09-13-2022; Agenda for September 13, 2022 Work Session
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 09-20-2022 Business Meeting\Agenda - 09-13-2022 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 <br /> NEW HOPE ELEMENTARY SCHOOL School Capacity' <br /> Major capital Projects Requiring Additional Funding SAPFO CAPACITY 526 <br /> MEMBERSHIP COUNT 579 <br /> AGE OF SCHOOL/BUILDINGS 1991 <br /> CAPACITY <br /> PROJECT PRIORITY&CATEGORY ESTIMATED RANGE OF COST. <br /> IMPACT 2 <br /> Option SAFETY LOW HIGH <br /> 1 :IMPLEMENT SECURITY RECOMMENDATIONS $100,000.00 $140,000.00 N <br /> Subtotal $100,000.00 $140,000.00 0 <br /> Option NEW CONSTRUCTION&BUILDING ADDITIONS LOW HIGH <br /> _ <br /> Subtotal $0.00 $0.00 0 <br /> :MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10 <br /> OptionLOW HIGH <br /> .YEARS OF USABLE LIFE <br /> 1 NEW HVAC SYSTEM $1,727,825.97 $2,351,237.09 N <br /> 1 ENERGY MANAGEMENT SYSTEM UPGRADE $531,109.92 $682,855.61 N <br /> Subtotal $2,258,935.88 1 $3,034,092.70 1 0 <br /> Option !MAJOR BUILDING IMPROVEMENTS LOW HIGH <br /> 1 ;:FOOD SERVICE RENOVATIONS $18,937.15 $26,057.52 N <br /> I IHAZARDOUS MATERIAL REMOVAL:CARPET AND MASTIC $340,868.78 $378,743.09 I N <br /> I :LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE $409,669.73 $515,835.97 N <br /> I ::NEW EMERGENCY GENERATOR LIGHTING $227,618.54 $379,364.23 N <br /> Subtotal $997,094.20 $1,300,000.81 0 <br /> Grand Total (2024 Costs w/increased capacity):: $3,356,030.09 $4,474,093.50 0 <br /> Number of mobile units currently on site 2 <br /> Note:The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities <br /> Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded. <br /> 7 Scnooi capacity:urange Counry coos equate Pubuc vacaitles uroinance nnual memDersnip coun ovember 7b, 2U79.Levei or <br /> Service(LOS)means the amount(level)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary level <br /> (K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School I 10%.Source:Orange County NC <br /> SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall be at the <br /> Ifollowing ratios for 2021-2022:Kindergarten(1:18), 1st Grade(1:16),2nd&3rd Grade(1:17). <br /> 12Capacity Impact:YIN(number indicates number of potential seats gained or lost.) <br /> Priority Ranking Key <br /> Kepair,replacement or renovation of items,components or systems tnat are important to tne nealtn an satety of tne stuaens and <br /> staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code <br /> violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not <br /> Option 1 being met by current systems) <br /> option 2 Repair and renovation of long-range items that also bring the class sizes uare footage of elementary classrooms to 1,200 sf <br /> Option 3 Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet <br /> REVISED DATE:1/812022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.