| River Park Elementary School    				School Capacity'       35
<br />   				Major capital Projects Requiring Additional Funding 			SAPFO CAPACITY       502
<br />       														MEMBERSHIP COUNT       601
<br />       	AGE OF SCHOOL/BUILDINGS       							1956
<br />       	PROJECT PRIORITY&CATEGORY						ESTIMATED RANGE OF COST.  CAPACITY
<br />																		IMPACT 2
<br /> 		Option   SAFETY   									LOW     	HIGH
<br />    		1      IMPLEMENT SECURITY RECOMMENDATIONS       			$100,000 	$140,000    	N
<br />  								Subtotal 				$100,000 	$140,000    	0
<br /> 		Option   NEW CONSTRUCTION&BUILDING ADDITIONS				LOW     	HIGH
<br />    		2      RENOVATE/EXPAND EXISTING 2-4 WING    				$4,999,409       $5,732,655   	Y
<br />    		2     1 DECONSTRUCT/EXPAND EXISTING 4-5 WING       			$6,665,878       $8,332,348   	Y
<br />    		3     :NEW CONNECTOR     							$587,052 	$733,815    	N
<br />    		3     :RENOVATE EXISTING K-1 WING     					$2,670,139       $3,076,000   	N
<br />    		3     :RENOVATE EXISTING OFFICE SUITE 					$348,444 	$401,407    	IN
<br />  								Subtotal				$15,270,921      $18,276,225	TBD
<br />  			;MAJOR SYSTEMS RECOMMENDED FOR REPLACEMENT WITH<10
<br /> 		Option       										LOW     	HIGH
<br />  			.YEARS OF USABLE LIFE
<br />    		1      NEW BOILER   								$242,396 	$302,994    	N
<br />  			::HVAC MECHANICAL UPGRADES
<br />    		1											$439,000 	$939,000
<br />  			I(CLASSROOM WINGS)
<br />    		3     :ENERGY MANAGEMENT SYSTEM UPGRADE 				$375,474 	$482,752    	N
<br />  								Subtotal				$1,056,869   i   $1,724,746   	0
<br /> 		Option   MAJOR BUILDING IMPROVEMENTS    					LOW     	HIGH
<br />    		I      LIGHTING: ENERGY EFFICIENT LIGHTING UPGRADE			$370,326 	$510,437    	N
<br />    		1     :NEW EMERGENCY GENERATOR LIGHTING  				$160,917 	$268,196    	N
<br />  								Subtotal    			i     $531,243    i    $778,632   	150
<br />  								Grand Tota13(2024 cost estimate):.   $16,959,034      $20,919,604	TBD
<br />       	TBD				Number of mobile      									2
<br />       	Note:The above cost estimates include major projects that were identified in the 2013-2014 Schools Comprehensive Facilities
<br />       	Assessment as well as projects that have been identified since that study.None of the projects listed have been fully funded.
<br />       	I School Capacity:Orange County NC Schools Adequate Public Facilities Ordinance(SAPFO).Annual membership count November 15,2019.Level of
<br />       	Service(LOS)means the amount(level)of students that can be accommodated(serviced)at certain school system grade group.[i.e.,Elementary level
<br />       	(K-5),Middle Level(6-8),High School Level(9-12)]Standards for LOS:Elementary 105%,Middle 107%,High School 110%.Source:Orange County NC
<br />       	SAPFO Annual Report. Class size reduction phase-in based on House Bill 90(SL 2017).Allotment and average class size in grades K-3 shall be at the
<br />       	following ratios for 2021-2022:Kindergarten(1:18), 1st Grade(1:16),2nd&3rd Grade(1:17).
<br />      	F2Capacity Impact:YIN(number indicates number of potential seats gained or lost.)
<br />       	3Annual inflaitonary construction cost increased is calculated at 6%
<br />       	Priority Ranking Key
<br />   			Repair,replacement or renovation of items,components or systems that are important to the health and safety of the students and
<br />   			staff and to sustain the overall operation of the facility.General maintaince and system service life upgrades.(state building code
<br />   			violations,health department violations,handicapped accessibility issues,removal of hazardous material,security issues not
<br />		Option 1  being met by current systems)
<br />		Option 2  Repair and renovation of long-range items that also bring the class sizes uare footage of elementary classrooms to 1,200 sf
<br />		Option 3  Repair and long-range improvements that extend a minimum of twenty-five years of additional operation to a facility and meet
<br />       	REVISED DATE:1/812022
<br /> |