Orange County NC Website
Attachment 1-b <br />LAND USE ELEMENT OUTLINE <br />July 13th -Receive draft at Planning Board Meeting and begin providing written <br />comments at August 3`d Meeting <br />A, LAND USE ELEMENT <br />1. Introduction <br />a, Purpose and Structure <br />b, lJpdate Process and Citizen Participation <br />2, Population <br />a. Past and Present Trends <br />b. Migration <br />c. Race, Sex, and Age <br />d, Projections <br />3, Existing Conditions <br />a, General Framework <br />b. Townships <br />c. Evaluation and Appraisal of Existing Plan <br />4, Growth Management and Future Land Uses <br />a. Basic Concepts and Plan Gategories <br />b, Trend Analysis <br />c, Issues and Challenges <br />d, Locational Criteria <br />e. Future Land l)se Plan Map <br />f. Area Plans <br />1. Small area plans <br />2. Urban transition areas <br />3. Joint Planning Land Use Plan <br />g. Orange County Watersheds <br />1. Introduce watershed-based planning areas (SPAS) <br />i. Little River/Hyco Creek - LRHC <br />ii, North Rural Buffer/University Lake/Jordan Lake - RBUL <br />iii. Haw River/Cane Creek - HRCC <br />iv. Upper Eno <br />v, Lower Eno <br />2, Justification for Planning by Watersheds <br />3. Residential Density <br />September 1 or 2 -Receive draft in agenda packet far September 8th meeting and <br />provide written comments on September 8th and written and/or verbal <br />comments on October 5th. <br />5. Goals, Objectives, and Policies (Specific only where related to <br />land use; With regard to the other Elements, work groups will <br />provide their respective specific Goals, Objectives and Policies) <br />a. Land Use and Transportation <br />b, Public Facilities and Phased Growth <br />c. Levels of Service <br />d. Urban Sprawl <br />G:\Comprehensive Planning Div\GENE\2005 Public HearingsWUg 22 (Changed to WS)\LUE and CPW,tt tb-LUE Ou(linedoc <br />