Browse
Search
2022-418-E-Solid Waste-The Autumn Breeze Group, Inc-Repair pad cover
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-418-E-Solid Waste-The Autumn Breeze Group, Inc-Repair pad cover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 1:11:33 PM
Creation date
9/2/2022 1:11:16 PM
Metadata
Fields
Template:
Contract
Date
8/22/2022
Contract Starting Date
8/22/2022
Contract Ending Date
9/2/2022
Contract Document Type
Contract
Amount
$8,607.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The AUTUMN BREEZE Group <br />Incorporated <br />======================================================== <br /> <br />1 <br /> <br />============================================================================================== <br />Specializing in Architecturally Designed and Engineered Fabric and All -Steel Buildings <br /> <br />August 18th , 2022 <br /> <br /> <br />Orange County Solid Waste Management <br />1207 Eubanks Rd. <br />Chapel Hill, NC 27516-7177 <br />919-918-4907 <br />mbaskerville@orangecountync.gov <br /> <br /> <br /> <br />Dear Cheryl and Woody, <br />Please find below a quote for the material, lift equipment and labor to repair the end bonnet flap on your Cover- <br />All building. Let me know what else I can provide to you. <br /> <br />QUOTE: 1 <br /> Part A: Material and Parts <br /> <br />➢ (1) Galvanized end bonnet flap cable <br />➢ Misc. required fastening hardware to complete the project professionally <br /> <br />Part B: Labor to Install Material <br /> <br />1. Remove the existing broken cable <br />2. Un-terminated the bonnet flap <br />3. Insert the new cable in the bonnet flap tensioning pocket <br />4. Secure the cable in the tensioning winches <br />5. Re-terminate the end bonnet flap <br /> <br />The Price for Quote 1 - Part A and B as Described is: <br /> $8,546.00 <br />Price is good for 14 days – Tax is an additional $60.62 <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 429EBC53-99A7-4D94-889E-72A74E75913F
The URL can be used to link to this page
Your browser does not support the video tag.