Browse
Search
Agenda - 08-22-2005-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 08-22-2005
>
Agenda - 08-22-2005-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:32:41 PM
Creation date
8/29/2008 10:37:32 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2005
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20050822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE LOUIS BERGER GROUP, INC. <br />1513 Walnut Street, Suite 250, Cary, North Carolina 27511 <br />Tel (919) 467.3685 Fax (919) 467-9458 ww~v louisbergercom <br />Phase I -Background Research ~ Status <br />Data Gathering _ <br />A. Meet with County Planning Staff (2) Three meetings with staff have been completed <br /> to date. Additional meetings have not been <br /> scheduled. <br />B. Collect & Review Documents and Data 95% Completed. Tracking down water/sewer GIS <br />Files data (other than OWASA) has been a significant <br /> challenge; the staff has been passed to different <br /> eo le Burin a series of contacts. <br />C. Conduct Key Person Interviews 90% Completed and submitted in draft form <br /> (8.12.2005). Some interviews remain, especially <br /> private development interests, who are not <br /> returning numerous phone calls. We will not be <br /> able to complete interviews with County <br /> Commissioners besides Barry Jacobs, according <br /> to information rovided b the Count Clerk. <br />D. Analyze Property Values & Market Trends Completed in draft form submitted (8.12.2005). <br />E/I. Summarize preliminary issues and Completed in draff form submitted (8.12.2005). <br />decision flow chart/Review Results with <br />Planning Staff <br />F. Develop a Public Engagement Process Completed (June, 2005). <br />Plan <br />G. Research & Analyze NC case law 90% Completed and submitted in draft form <br /> (8.12.2005).. Finalizing this item depends on <br /> having a second meeting with the County <br /> aitorne . <br />H. Research & Analyze relevant TDR case Completed and submitted in final form <br />studies (8.12.2005). <br />J. Meet with Task Force to Review Planning No scheduled meeting date for Task Force. <br />Process (t) <br />Upcoming Events <br />1. We should set a target date for (a) the next staff-level meeting and (b) <br />the first Task Force meeting. <br />2, Review by County staff of the draft report, submitted by Consultant on <br />8.12.2005. <br />Schedule Adherence (8,12.2005) <br />By mutual agreement of County and Consultant staff, the original <br />schedule is no longer valid, and must be updated prior to providing a <br />comparison to existing progress. <br />
The URL can be used to link to this page
Your browser does not support the video tag.