Browse
Search
Agenda - 09-06-2022; 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 09-06-2022 Business Meeting
>
Agenda - 09-06-2022; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 3:52:36 PM
Creation date
9/1/2022 3:41:58 PM
Metadata
Fields
Template:
BOCC
Date
9/6/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for September 6, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 09-06-2022 Business Meeting
Minutes 09-06-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 <br /> 1 Slide #12 <br /> HDR is an employee-owned global design firm specializing in engineering,architecture, environmental <br /> and construction services. HDR has around 11,000 employees.Their headquarters is located in Omaha, <br /> Nebraska. In North Carolina,they have off ices in Charlotte, Raleigh,Wilmington,and Winston-Salem.At <br /> the time of the D-0 LRT project,Jonathan Henderson was the authorized representative and contract <br /> signatory for H DR, <br /> Learn more about HDR on their website athttps-llwv4rww.hdrinc-comlabaut-us- <br /> A!o u r. <br /> 2 <br /> 3 <br /> 4 Slide #13 <br /> i HDR was contracted for final design services related to the engineering <br /> phase of work. <br /> * TH5 work included: <br /> o Field Surveys and investigations, including exploration for Subsurface <br /> utility engineering, inspectionsfor hydraulic/drainage design, <br /> geotechnical borings, and seismic response tests. <br /> o Engineering plans and specifications, including the design of <br /> multiple bridges, aerial structure5,and Stations. <br /> Environmental management, including mitigation monitoring plans <br /> and the evaluation of proposed changes to the design of the project,. <br /> o Value engineering, which was required to mitigate potential project <br /> cost increases. <br /> Management <br /> General ' ' Consultant <br /> Engineering <br /> HDR <br /> 5 $86,775,632 <br /> 6 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.