Browse
Search
Agenda - 09-06-2022; 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 09-06-2022 Business Meeting
>
Agenda - 09-06-2022; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 3:52:36 PM
Creation date
9/1/2022 3:41:58 PM
Metadata
Fields
Template:
BOCC
Date
9/6/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for September 6, 2022 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2022\Agenda - 09-06-2022 Business Meeting
Minutes 09-06-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> 1 Slide #10 <br /> URS Corporation (formerly United Research Services) was an engineering, design, <br /> and construction firm.Headquartered in San Francisco, California,URS was a full-service, global <br /> organization.URS was acquired by AECOM in 2034.At the time of the D-0 LRT project,Tim H. <br /> Keener was the authorized representative and contract signatory for URS, <br /> AECOM(formerlyAECOM Technology Corporatism) is a global infrastructure consulting firm, <br /> delivering professional services related to planning,design and engineering, program <br /> management,and construction management.AECOM has approximately 53,O employees.Their <br /> headquarters is located in Dallas,TX, In North Carolina,they have offices in Raleigh,Morrisville, <br /> and Charlotte.At the time of the D-0 LRT project,.Doug Tennant was the authorized <br /> representative and contract signatory for AECOM, <br /> Learn more about AECOM on their website at bttps://aecom.com/;)bout-us/- <br /> About! URS/AECOM <br /> 2 <br /> 3 Katherine Eggleston said these firms were procured by a competitive process. <br /> 4 <br /> 5 Slide #11 <br /> URS/AECOM was contracted for services related to the project development phase of work. <br /> During project development, potential project impacts were assessed and required <br /> environmental analysis was completed. Environmental analysis culminated in an <br /> Environmental Impact Statement and a Supplemental Environmental Assessment <br /> containing over 700 pages of documentation. <br /> * URSfAECOMcompleted a 30 percent level of engineering drawings and plans that were <br /> needed to design the project,as it was anticipated at that time, <br /> Management ;• Deslign <br /> Project Development • <br /> U RS/AECOM <br /> 6 $26,722,828 <br /> 7 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.