Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 99 <br /> Section 6.14:Stormwater Management <br /> (ii) What specific quantitative criteria will be used for determining <br /> when those actions are to be taken, and <br /> (iii) Who is responsible for those actions, consistent with the <br /> OMA. <br /> (b) 223The standard MaiAt@AaAG@ ptapQMP shall specifically address, but is <br /> not limited to: <br /> (i) A%9Mowing of permanent vegetation, <br /> (ii) A erpovalRemoval of woody vegetation (e.g. bushes, shrubs <br /> and trees) from the dam of a w@t d@t@PflQA pGpidgDyL dam <br /> and/or224 berm structures, <br /> (iii) Reseeding of any eroding areas of tho yiof d(;tQAtinn PgAds <br /> nnon nhannol pr GtiGoc ripariap b ifrorc aAd yagotat6;d filto9#4r <br /> r <br /> (iv) Replacgmentiag of impaired vegetation <br /> (v) Removal of sediment and/or debris from the `trash rarl,' @A aAY <br /> inlet and outlet channels, inlet <br /> and outlet pipes, forebays, trash racks, and riser or barrel <br /> structures225, and <br /> (vi) Repair of any damage/deterioration to structural aspects of caret <br /> RaAd filtp-psthe SCM. <br /> (c) The PI.A OMP shall clearly indicate the steps that will be taken for <br /> restoring a SCM to its design specifications if an SCM226 failure occurs. <br /> (3) Landscaping and Grounds Maintenance <br /> (a) Landscaping and grounds maintenance shall be the responsibility of the <br /> owning entity. <br /> (b) Vegetation shall not be established or allowed to mature to the extent <br /> that the integrity or functionalitv227 of the SCM is <br /> diminished or threatened, or to the extent of interfering with any <br /> easement or access to the SCM. <br /> (4) SCM228 Repair or Reconstruction <br /> (a) Except for general landscaping and grounds maintenance, the owning <br /> entity shall notify tl�Oranoe229 County prior to any repair or <br /> reconstruction of the SCM. <br /> (b) After notification by the owning entity, the Erosion Control Officer shall <br /> inform the owning entity of any required additions, changes or <br /> modifications and of the time period to complete said SCM230 <br /> improvements. <br /> 221 Sub-section revised to fix grammar errors and improve readingclarity. <br /> 224 Edit(s)based on Legal Sufficiency Review comments <br /> 225 Edit(s)based on Legal Sufficiency Review comments <br /> 226 Clarification thatthis sub-section is referenci ng an"SCM" failure. <br /> 227 Text correction—added `or functionality". <br /> 221 Clarification that thi s sub-section is referencing"SCM" repair or reconstruction. <br /> 229 Consistent reference to"Orange County". <br /> 230 Clarification that improvements are specific to"SCMs" only. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.