Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 74 <br /> Section 5.21:Standards for Miscellaneous Uses <br /> (vii) Use of xeriscaping principles. <br /> (e) Stormwater Management <br /> (i) A Stormwater Management Plan (SMP)136 shall be prepared and <br /> reviewed in accordance with the provisions of Section 6.14 of <br /> this Ordinance. <br /> (i i) All drainage structures will be installed and maintained according <br /> to the approved M@A@q@PA@At SMP. <br /> (iii) Subdivisions that include Sstormwater Csontrol Mn4easures <br /> (SCMs) shall comply with Section 6.14 of this Ordinance. <br /> (f) Grading and Erosion Control <br /> (i) Plans for grading and erosion control comply with standards <br /> contained in the GraA99 GOWPty ErnciQA and 29dimon# C:QAtrnl <br /> M;4p-almost current version of the North Carolina Administrative <br /> Code Title 15A Chapter 4: Sedimentation Control, and the most <br /> current version of the North Carolina Erosion and Sediment <br /> Control Planning and Design Manual (NC Erosion Control <br /> Manual). <br /> 137 a IS <br /> (Drd'PaPG8; <br /> (i i) Construction is phased to the extent practical to minimize <br /> disturbance and sedimentation; <br /> (iii) Sediment control measures will be properly installed to filter <br /> sediment from runoff during construction and maintained until <br /> grading is complete and a permanent vegetative cover has been <br /> established and all slopes stabilized; and <br /> (iv) Permanent landscaping, groundcover, mulch, etc. will be <br /> installed as soon as practical after construction activities for each <br /> phase are completed. <br /> (g) Solid Waste Management Plan <br /> A solid waste management plan, submitted as part of the Resources <br /> Management Plan, shall include the method(s) of disposal and recycling <br /> of construction debris. <br /> (h) Irrigation <br /> (i) Irrigation systems for the subdivision and the lots in the <br /> subdivision are designed and can be operated according to a <br /> water conservation plan described in the Resources <br /> Management Plan submitted with the application; <br /> (ii) The Resources Management Plan shall identify the source(s) of <br /> water to be used for irrigation, the volume available for that <br /> purpose, and expected consumption rates. The system design <br /> and plan for operation will be evaluated based on efficiency; and <br /> (iii) Water recycled from stormwater retention ponds or treated <br /> wastewater effluent may be used for irrigation where it is a <br /> legally permitted alternative. <br /> (i) Habitat Maintenance <br /> 116 Consistentuse of"Stormwater Management Plan(SMP)"—NOTE: "Stormwater Management Plan"and <br /> "SMP"is integrated through the remainder of Article 5, where applicable. <br /> 117 Correct reference to the North Carolina manual. There is no Orange County manual. <br /> Orange County, North Carolina— Unified Development Ordinance Page 5-124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.