Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 68 <br /> Section 5.10:Standards for Telecommunication Facilities <br /> possible given the facts and circumstances involved. <br /> (q) Lighting <br /> (i) The wireless support structures will not be artificially lighted <br /> unless required by the FAA, FCC or other federal or state <br /> agency. Where such agencies allow a choice between painting <br /> the tower or installing strobe lighting, painting shall be the <br /> preferred choice. <br /> (i i) If lighting is legally required or proposed, the applicant shall <br /> provide a detailed plan for sufficient lighting of as unobtrusive <br /> and inoffensive an effect as is permissible under State and <br /> federal regulations. <br /> (iii) For any facility for which lighting is required under the FAA's <br /> regulations, or that for any reason has lights attached, all such <br /> lighting shall be affixed with technology that enables the light to <br /> be seen as intended from the air, but that prevents the ground <br /> scatter effect so that it not able to be seen from the ground to a <br /> height of at least 12 degrees vertical for a distance of at least <br /> one mile in a level terrain situation. Such device must be <br /> compliant with or not in conflict with FAA regulations. A physical <br /> shield may be used, as long as the light is visible from the air, as <br /> intended by the FAA. <br /> (iv) All outdoor lighting not regulated by the FCC shall comply with <br /> the Outdoor Lighting Standards set forth in Section 6.11 of this <br /> Ordinance. <br /> (r) The tower and antenna will not result in a significant adverse impact on <br /> the view of or from any historic site, scenic road, or major view corridor. <br /> (s) Facilities, including antennas, towers and other supporting structures, <br /> such as guy anchor points and wires, shall be made inaccessible to <br /> individuals and constructed or shielded in such a manner that they <br /> cannot be climbed or collided with; and transmitters and <br /> telecommunications control points shall be installed in such a manner <br /> that they are readily accessible only to persons authorized to operate or <br /> service them. <br /> (t) 411 QbQPdQAQd rnmmi inin9#inn kniirolocc S innnr# c#n irtW-ocdoll ho <br /> rRmg�md 1:2 mnn#�9c nfof noccotiQn of usp a bopd nr n#hor <br /> core irity g for@n#ooinn the mrpo al of#ho #n1nior in #ho 41bn# #h@-# it is <br /> Of th@ 68G61Fity Shall be 0 <br /> of <br /> the Astimate 129 <br /> (y}(t) A determination shall be made that the facility and its equipment will <br /> comply with all federal, state and local emission requirements, and the <br /> Special Use Permit or Conditional District approval shall include a <br /> statement that the facility and its equipment will comply with all federal, <br /> state and local emission requirements. <br /> 0.4)(u 1 Electro-Magnetic Radiation Levels <br /> (i) The Special Use Permit or Conditional District approval shall <br /> include a condition that the elect ro-m ag netic radiation levels <br /> maintain compliance with requirements of the FCC, regarding <br /> emission of electromagnetic radiation. <br /> 129 Covered within subsection(5)below. <br /> Orange County, North Carolina— Unified Development Ordinance Page 5-84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.