Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46 <br /> 2.26.9 Stormwater Management Plan <br /> (A) Appeals of the Erosion Control Officer's decision on a Stormwater Management Plan <br /> (SMP)92 shall be made to the Orange County Planning Director. <br /> (B) If the Planning Director upholds the decision, the applicant shall be entitled to a public <br /> hearing if the applicant submits written demand for a hearing within 15 days after receipt <br /> of written notice of disapproval, modification, or conditions of approval. <br /> (C) The hearing shall be conducted by the Orange County Planning Board within 30 days <br /> after receipt of written demand for a hearing. <br /> (D) The Orange County Planning Board shall make recommendations to the Board of County <br /> Commissioners within 30 days after the date of the hearing. <br /> (E) The Board of County Commissioners shall render its final decision on any PtormwateK <br /> PP@A@9om9n# ^I@^SMP upon which a hearing is requested within 30 days of receipt of the <br /> recommendations from the Planning Board. <br /> 2.26.10 Appeal of Stop Work Orders Regarding Stormwater Management Plan93 Provisions <br /> (A) The person conducting the development activity may appeal a stop work order to the <br /> Board of County Commissioners within a period of five days after the order is issued. <br /> (B) Notice of the appeal shall be given in writing to the Board of County Commissioners, with <br /> a copy to the Erosion Control Officer. <br /> (C) The Board of County Commissioners shall conduct a hearing at their next scheduled <br /> business meeting at which the appellant and the Erosion Control Officer or Inspector <br /> shall be permitted to submit relevant evidence, and shall rule on the appeal as <br /> expeditiously as possible. <br /> (D) Pending the ruling by the Board of County Commissioners on an appeal, no further work <br /> shall take place in violation of a stop work order. <br /> 2.26.11 Appeals from Final Decisions Regarding Soi I Erosion and Sedirnenta to on Control <br /> Erosion and Sedimentation Control Plan94 Civil Penalties <br /> (A) Appeal from Board of County Commissioners or Other Governing Body Decisions <br /> Appeal from the final decision of the governing body regarding civil penalties assessed <br /> for violations of the 95 erosion and sedimentation control provisions of this Ordinance <br /> shall be to the Superior Court of the county where the violation occurred, or in the county <br /> where the violator's residence or principal place of business is located. <br /> 2.27.1 Application Requirements <br /> (A) The purpose of a Performance Guarantee is to ensure proper installation of required <br /> improvements (i.e. roadways, landscaping, parking, utility infrastructure, impervious area, <br /> etc.) in a timely manner in accordance with approved plans, plats, and construction plans. <br /> (B) When a Performance Guarantee is required under this Ordinance, or necessary for the <br /> completion of required imorotements, applicants shall submit a Performance Guarantee <br /> application for processing in accordance with Section 2.2 of this Ordinance. Applications <br /> 92 Reference to the appropri ate acronym for Stormwater Management Plan(SMP)—NOTE. "SMP"is integrated <br /> through remainder of Section 2.26,where applicable. <br /> 93 Consistent reference to"Stormwater Management Plan". <br /> 94 Consistent reference to"Erosion and Sedimentation Control Plan". <br /> 95 Deleted "soil". <br /> 96 NEW SECTION. <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.