Orange County NC Website
37 <br /> Plan submittal is not considered complete until the appropriate review fees have been <br /> paid in full.51 <br /> (A41(B) Once an Erosion and Sedimentation Control Plan has been determined to be complete <br /> by the Erosion Control Officer and the appropriate review fees have been paid in full, <br /> theThe Erosion Control Officer shall within 30 business days <br /> Of POGGipt th&:90f Will notify the Erosion and Sedimentation Control Plan that it hag; <br /> bae:tapplicant in writing that the complete Erosion and Sedimentation Control Plan has <br /> been: <br /> (1) Approved, <br /> (2) Approved with modifications, or <br /> (3) Approved with ronrlitionc <br /> (4) Approved with performanGe 52 <br /> (5)(3) Disapproved. <br /> (&)LqL Examples of approvals with modifications include but are not <br /> limited to: <br /> (1) Channel stabilization must be successful or another type of lining must be used; <br /> (2) Delineating certain areas to be graded and stabilized within a specified number <br /> of days to reduce the potential for erosion and protect critical areas; <br /> (4}U_Requiring the person fiAaAGmally res pens i bleFinancially Responsible Party to <br /> retain the services of a professional engineer or architect to supervise <br /> implementation of the approved F�i^n Erosion and Sedimentation Control <br /> PlanCoptrgl Plan. <br /> (C-)(D) Disapproval of an Erosion and Sedimentation Control Plante must specifically state in <br /> writing the reasons for disapproval. <br /> 2.19.6 Timeframe for Review of AJav_53Erosion and Sedimentation Control Plans54 <br /> Failure by the Erosion (control Offiger to approve approve with ronditionc approva with <br /> GO <br /> �-An Erosion and Sedimentation Control Plan shall be deemed approved if not <br /> otherwise acted upon by the Erosion Control Officer within 30 calendar days of the Erosion <br /> Control Officer's determination that the Erosion and Sedimentation Control Plan submittal is <br /> complete.56 <br /> 2.19.7 Required Revisions <br /> (A) If, following commencement of a Land-Disturbing Activity/ pursuant <br /> to an approved plan rosion and Sedimentation Control Plan, the Erosion Control Officer <br /> determines that the plan- rosion and Sedimentation Control Plan is inadequate to meet <br /> the requirements of the s9i_57erosion and sedimentation provisions of this Ordinance, the <br /> 51 Added clarification herethat a plan submittal is notconsidered complete until review fees are paid. <br /> 51 "Approved with conditions"and"Approved with performance reservations"have been eliminatedbasedon <br /> most current NCAC changes(15A NCAC 0413.0118),revised based on NCDEQ peer review comment. <br /> 53 Edit(s)based on Legal Sufficiency Review comments. <br /> 54 Text correction-added "s". <br /> This secti.,.,WaS clarified/refined based 0-R NGDEQ peer or,+ <br /> 56 Edit(s)based on Legal Sufficiency Review comment from July28,2022. <br /> 51 Deleted "soil". <br /> Orange County, North Carolina- Unified Development Ordinance Page 2-65 <br />