Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br /> 2.17.5 Approval Criteria <br /> (A) No application for a plat vacation shall be approved unless it complies with all applicable <br /> requirements of this Ordinance. <br /> (B) The approving entity shall not approve an application for a plat vacation if it will materially <br /> injure the rights of any non-consenting property owner or any public rights related to <br /> public improvements unless expressly agreed to by the agency with jurisdiction over such <br /> improvements. <br /> 2.17.6 Recording <br /> (A) After the new plat is approved, the plat must be recorded, within 60 days, with the <br /> Register of Deeds Office. <br /> (B) Upon the execution and recording of the new plat, the vacated plat has no effect. <br /> (C) The re-subdivision of the land covered by a plat that is vacated shall be platted in the <br /> same manner as is prescribed by this Article for an original plat. <br /> LAND DISTURBING PERMITS <br /> 2.18.1 Generally <br /> (A) Before commencement of any Land-Disturbing Activity in excess of the thresholds as <br /> defined in the Orange County Watershed Matrix (Table 4.2.10 of this Ordinance), starting <br /> a_ <br /> IJAiVOrSity Lake, GaA@Graek, or Upper , the owner or his/her 44Y <br /> appe+Ated agentFinancially Responsible Party shall obtain a Land Disturbing Permit <br /> L( DP) from the Erosion Control Officer. For developments that are subject to Orange <br /> County Stormwater Management requirements, if a permanent Stormwater Control <br /> Measure24 (SCM) is required as part of a Land-Disturbing Activity. the LDP will not be <br /> issued by the Erosion Control Officer until the owner or his/her Financially Responsible <br /> Party posts a Performance Guarantee for construction of the SCM in conformance with <br /> Section 6.22 (F) of this Ordinance.25 <br /> (B) Land asturhing Parmot. LDPs must be obtained prior to the start of the land <br /> dis#arhanseLand-Disturbi ng Activity. <br /> (C) Every permit-LDP issued by the Erosion Control Officer shall expressly prohibit open <br /> burning of trees, limbs, stumps and construction debris associated with the permitted <br /> astkAtyLand-Disturbing Activity. <br /> (D) If a developer, corporation, private landowner or other person proposes to perform <br /> construction/filling activities in or near a lake, stream, creek, tributary or any unnamed <br /> body of water and its adjacent wetlands, Federal permit authorization may be required by <br /> the U.S. Army Corps of Engineers prior to commencement of P_'i4h d�;+i irhi Pg <br /> ac;tMtiesLand-Disturbing Activities. <br /> 23 Section 2.18 title updated to includeappropriateacronym for Land Disturbing Permits(LDPs)—NOTE. "LDP"is <br /> integrated through the remainder of Section 2.18, where applicable. <br /> 24"Stormwater Control Measure"is correctly noted to match the Definitions section of this Ordinance,includes the <br /> appropriate acronym for Stormwater Control Measure(SCM)—NOTE. "Stormwater Control Measure" and"SCM" <br /> are integrated through the remainder of Section 2.18,where applicable. <br /> 25 Section 2.18.1 (A) updated so as to: 1) reference the "Orange County Watershed Matrix Table"(located in new <br /> Section 4.2.10)for determining land disturbancethresholds specificto each watershed within Orange County, 2) <br /> better refl ect current sta nda rd operati ng procedures for obta i ni ng a La nd Di sturbi ng Permit,3)i ncl udethe <br /> requirement for a performa nce gua ra ntee ifanSCM is required as partof Land-DisturbingActiviti es,4)repl ace the <br /> term "duly a ppoi nted agent" with "Financially Res ponsibleParty"so as to match the Defi nitions section of thi s <br /> Ordinance,and5) reference the new Section 6.22. <br /> Orange County, North Carolina— Unified Development Ordinance Page 2-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.