Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 130 <br /> Section 6.22:Performance Guarantee Standards erformance Gurantee331F <br /> described in Section 6.14.10(B)(6) of this Ordinance. <br /> ra+'nns <br /> If the SCM passes inspection and the Erosion Control Officer approves all of the <br /> required SCM documents as described in this Ordinance, then the Erosion <br /> Control Officer shallwiR release 75%344 of the value of the SCM Performance <br /> Guarantee and shall-wW issue a Certificate of Stormwater Compliance for the <br /> SCM, subject to approval of the Planning Director who shall approve it upon <br /> receipt of a recommendation by the Erosion Control Officer.345 <br /> If#ho r 'or# ossos ins or+inn and #ho Grnsinn Coptrnl Of nor arro +s#h <br /> rer#Ifira+inn dQQd and oasomen+s the onnliran+ shall file +ho deor# and <br /> 0 <br /> Om 1i2nn8 Dnrm i4 fir+hn <br /> 3" <br /> (8) If the SCM does not pass inspection and/or the submitted SCM documents are <br /> considered by the Erosion Control Officer to be incomplete, then the Erosion <br /> Control Officer shall direct the owning entity to make any necessary SCM <br /> improvements and/or to resubmit corrected documents for approval.347 Upon <br /> completion, the SCM improvements shall be re-inspected by the Erosion Control <br /> Officer. <br /> If dofirionrioc ore fniinrl MR Emsinn (`nn+rnl Offiror shall dmror# +ha+ +ho <br /> a rrnr�l I I nn ram Ie#inn +ho shall ho ro_inc or+or# 343 <br /> (9) No sooner than one year after issuance of the Certificate of Stormwater <br /> Compliance for the SCM, the owning entity may petition the Planning Director to <br /> release the remaining value of the SCM Performance Guarantee. Upon receipt of <br /> said petition, the Erosion Control Officer shall inspect the SCM to determine <br /> whether the SCM is performing as designed and intended. The Erosion Control <br /> Officer shall present the petition, the SCM inspection report, and <br /> recommendations to the Planning Director. <br /> (a) If the Planning Director approyes349 the petition and SCM inspection <br /> report, then the Erosion Control Officer shall release the remaining value <br /> of the SCM Performance Guarantee. <br /> If the Planning Director does not accept the petition and/or SCM <br /> inspection, then the Erosion Control Officer shall provide the owning <br /> entity with instructions to correct any SCM deficiencies necessary for the <br /> release of the remaining value of the SCM Performance Guarantee.9:�e <br /> +ho limn+ MAV Qqt0t0QP far +he roleaso of+ho romaininn <br /> Upon roroi + of said o+i+inn #ho Ernsinn Gopt -1 (lfflror shall ins or+ +h <br /> AtoAdt; If t shall ho ie n n n+ #ho <br /> 344 Edit(s)based on Legal Sufficiency Review comments. <br /> 345 Edit(s)based on Legal Sufficiency Review comments from August 24,2022. <br /> �B <br /> 347 Edit(s)based on Legal Sufficiency Review comments. <br /> 349 Edit(s)based on Legal Sufficiency Review comments. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.