Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 116 <br /> Section 6.15:Soil Erosion and Sedimentation Contro1268F <br /> (ii) Larger areas may be uncovered within the boundaries of the <br /> tract with the written approval of--by-the Director of the Dk4sien of <br /> Resources—t-The Division of Energy, Mineral, and Land <br /> Resources (DEMLR), upon the applicant providing engineering <br /> justification with a construction sequence that considers phasing <br /> limiting exposure, submission of weekly self-inspection reports, <br /> and more conservative design than the 25-year storm. The <br /> Director of DEMLR may also stipulate the inclusion of other <br /> conditions in the plan as necessary based on specific site <br /> conditions-314 <br /> (b) Erosion and Sedimentation Controls <br /> (i) Erosion and sedimentation control measures, structures, and <br /> devices within HQW zones shall be so planned, designed, and <br /> constructed to provide protection from the stormwater runoff of <br /> the 25-year storm which produces the maximum peak rate of <br /> stormwater runoff. <br /> (ii) The peak rate of stormwatel runoff shall be calculated according <br /> to procedures in the latest edition of the United States <br /> Department of Agriculture Natural Resources&DU Conservation <br /> Service's "National Engineering Field Mariial Handbook 630 for <br /> Conservation Practices"or according to other calculation <br /> procedures acceptable to the Erosion Control Officer <br /> anv other aoenov of this state or the I IAitQd Ctatec or env <br /> generally reGognized organization or <br /> (c) Sediment PondS315 <br /> M Sediment ponds (also called "sediment basins")w4hin HQW <br /> zones shall be planned, designed, and constructed to meet the <br /> following criteria: <br /> a. Use a surface withdrawal mechanism, except when the <br /> basin drainage area is less than 1.0 acre: <br /> b. Have a minimum of 1,800 cubic feet of storage area per <br /> acre of disturbed area: <br /> C. Have a minimum surface area of 325 square feet per cfs <br /> of Q25 peak inflow: <br /> d. Have a minimum dewatering time of 48 hours: and <br /> e. Incorporate 3 baffles, unless the basin is less than 20 <br /> feet in length, in which case 2 baffles shall be sufficient. <br /> a Ql lrh that the PGAd ;vill hW.o a cettli% effirienry of at <br /> IQAst 0 <br /> that 2-year storm whiGh PMCII-199-93 thQ_ Maximum peak <br /> rAW Of <br /> 114 Correctionof entity name andadditionofinformationfrom 15A NCAC Chapter4. <br /> 315 Revised to reflect current standards within 15ANCAC Chapter 4. <br /> Orange County, North Carolina- Unified Development Ordinance Page 6-126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.