Browse
Search
9.7.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
9.7.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 3:47:00 PM
Creation date
8/31/2022 3:41:27 PM
Metadata
Fields
Template:
BOCC
Date
9/7/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
9.7.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 101 <br /> Section 6.14:Stormwater Management <br /> if the Board of County Commissioners doos not aGcapt the r&PO4 <br /> and rejoGts the petition, it shall pr&Ade the developer vVith <br /> �41551--Annual SCM235 Inspection Required <br /> (a) All SCMs shall be inspected by the owning entity at least on an annual <br /> basis to determine whether the septets arQSCM is236 performing as <br /> designed and intended. <br /> (b) Records of inspections shall be submitted annually to the Erosion <br /> Control Officer on forms approved by Orange County. <br /> (c) Annual inspections shall begin within one year of the filing date of the <br /> issuance of the Certificate of Stormwater Compliance <br /> for the SCM.237 <br /> (d) The Erosion Control Officer will inspect each SCM approved pursuant to <br /> these rules approximately every five years. In the event the Erosion <br /> Control Officer discovers the need for corrective action of improvements, <br /> he/she shall notify the owning entity of the needed SCM238 improvements <br /> and the date by which the corrective action is to be completed. All <br /> SCM239 improvements shall be made consistent with the PlaAS aAd <br /> maiptepapro Alan or manwa approved SMP and the approved OMA.240 <br /> After notification by the owning entity, the Erosion Control Officer shall <br /> inspect and approve the completed SCM241 improvements. <br /> {�tq e u a4 5-year SCM242 Maintenance Inspection Fee <br /> (a) The t=ee-5-year SCM maintenance inspection fee for the first 5-year <br /> ep riod243 shall be paid before: <br /> (i) The release of any Final GertffiGat@ of QGcupanGy for Nop <br /> issuance of the Certificate of Stormwater <br /> Compliance for the SCM.244 <br /> (ii) The <br /> release of up to 75% of the value of the <br /> SCM Performance Guarantee.245 <br /> (b) The fee-5-year SCM maintenance inspection fee shall be based upon the <br /> current Orange County Planning Fee Schedule, and shall be paid to <br /> Orange County following each Ann iAll 5-year SCM246 inspection. <br /> 235 Clarification thatan annual inspection ofthe"SCM" is required. <br /> 236 Reference to the "SCM" ratherthan "controls". <br /> 231 Clarification of requi rements. <br /> 238 Clarification thatthis is referencing"SCM" improvements. <br /> 239 Clarification thatthis is referencing"SCM" improvements. <br /> 240 Clarification of requi rements. <br /> 241 Clarification thatthis is referencing"SCM" improvements. <br /> 242 Correct reference to the S-year inspection fee. Orange County does not require annual SCM inspection fees— <br /> NOTE. "5-year SCM maintenance inspection fee"is integrated through the remainder of Section 6.14,where <br /> warranted. <br /> 243 Clarification of requi rements,AND based on Legal Sufficiency Review comments. <br /> 244 Cl a ri ficati on of requi rements. <br /> 241 Cl a rification of requi rements. <br /> 246 Cl a ri ficati on of requi rements. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.