Orange County NC Website
Article 6: Development Standards 100 <br /> Section 6.14:Stormwater Management <br /> (c) All SCM231 improvements shall be made consistent with the approved <br /> plans and sper-,ifir--a-tions- of the 2C.M. and. the operations and <br /> Mi-RiAW-PERAGS plan or SMP, the approved OMA, and the approved <br /> OMP.232 <br /> 233 <br /> i nsnertinn the QWAing entity shall nrcWde• <br /> signod dood relatod easomonts and siineoY Plat for <br /> thQ cCM ready fnr filing with the Orango Gowpty <br /> �r <br /> thp- Axte-nt that thp- GA.n.A.ral Statute, Chapter 89A, allow) stating <br /> that the detention pGnd is Gemplete and r_,e__AR_is_tA_.At with the plans <br /> Register of Deeds; and <br /> \A/atershod Prntortinn Gemnlianre Permit for the 2-G-M 234 <br /> /nlif dofiPi@An04;9 are fownd the Fmsinn Goptrnl Qffinor shall direct that the <br /> siihmitted for annro�el Upon rmmPletinn the imnrnvemonts shall he <br /> re-inspeGted. <br /> (3) loam of Remaining SeGu Y1ty <br /> or other Seri ir4y <br /> /hr ) Upon mc;eint of said netitinn thtFrgsinn Goptrnl Qf rt;r shall insnert the <br /> -and rec-,AWArAe-ndations- to the _Board of County Commissioners <br /> 211 Clarification that improvements are specific to"SCMs" only. <br /> 212 Clarification of SCM repair or reconstruction requirements. <br /> 211 SCM Performance Guarantee requirements havebeen moved to Section 6.22(NEW SECTION). <br /> -34 Syb-section revised to rI;;rify the GerreGt r we rements. <br /> Orange County, North Carolina— Unified Development Ordinance Page 6-109 <br />