Browse
Search
2022-410-E-IT Dept-NetPlanner Systems-Change order 3 to outside plant fiber Optic infrastructure per RFP-367-OC5301
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-410-E-IT Dept-NetPlanner Systems-Change order 3 to outside plant fiber Optic infrastructure per RFP-367-OC5301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2022 8:36:58 AM
Creation date
8/31/2022 8:36:45 AM
Metadata
Fields
Template:
Contract
Date
8/30/2022
Contract Starting Date
8/30/2022
Contract Ending Date
8/31/2022
Contract Document Type
Contract
Amount
$10,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1229 Perry Road, Suite 109 <br />Apex, NC 27502 <br />Direct: (919) 290-8011 <br />Cell: (770) 833-7643 <br />andrew.rakestraw@netplanner.com <br /> <br /> <br />Atlanta, GA ● Augusta, GA ● Columbus, GA ● Savannah, GA ● Raleigh, NC <br /> <br />Corporate Headquarters: <br />3145 Northwoods Parkway, Suite 800 ● Norcross, GA 30071 <br />Office: (770) 662-5482 ● Fax: (770) 441-3773 ● Toll-Free: (800) 795-1975 <br /> <br />www.netplanner.com <br /> <br />SCOPE OF WORK <br /> <br />NetPlanner is providing a solid rock price to drill solid rock and pull back the 2 x1.25” ducts. The price per foot is <br />$51.50 and this includes all necessary equipment to perform a solid rock bore. The client will be billed accordingly for <br />rock footage per drill shot only. Example: if the shot is 500ft and 400 is dirt that part is cover under the previous quote <br />and this 100ft is to be billed at an additional per foot cost of $51.50 per foot and this is an adder to the main quote. <br />The additional cost is $ $5,150.00 <br />When bore path is determined to be rock, a soft or a solid rock adder will be allocated to overall cost accordingly. <br />NetPlanner reserves the right to bill that additional amount, upon mutual agreement price above before any rock is to <br />be drilled. <br />The rock drilling is a price per foot as an adder is $51.50 per foot. There is no way to know upfront how much solid <br />rock will be in the way. NetPlanner can do an open T&M of $51.50 per ft and then show how much solid rock total foot <br />at the end of the project. Or NetPlanner can do up to 194 ft $10,00.00 open PO. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 6884E077-E2E1-49CB-9160-FF791CF982BA
The URL can be used to link to this page
Your browser does not support the video tag.