Orange County NC Website
Revised 06/21 <br />ORANGE COUNTY <br />CHANGE ORDER REQUEST <br />NORTH CAROLINA <br />______________________________________________________________________________________________________________ <br />Date: 8/30/2022 Project: Outside Plant Fiber Infrastructure Change Order No. 3 Department: IT <br />Department Address: 131 W. Margaret Lane Project: 61370035-897086-30007 Contractor: NetPlanner Systems, Inc <br />Contractor Address: 1229 Perry Road, Ste 108 Apex, NC 27502 Effective date of original contract: 3March2021 (2021-160) <br />This change order increases decreases the contract time by days. Check here if no impact to contract time . <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial <br />completion is: <br />_______________________________________________________________________________________________________________ <br />Full Description of Change: NetPlanner is providing a solid rock price to drill solid rock and pull back the 2 x1.25” ducts. The price per foot <br />is $51.50 and this includes all necessary equipment to perform a solid rock bore. Orange County will be billed accordingly for <br />rock footage per drill shot only up to a maximum of $10,000. Example: if the shot is 500ft and 400ft of that is dirt, the 400ft is covered <br />under the previous quote and the 100ft of rock is to be billed at an additional cost of $51.50 per foot. In that example, the additional <br />cost would be $ $5,150.00. <br />The rock drilling is a price per foot as an adder is $51.50 per foot. There is no way to know upfront how much solid <br />rock will be in the way. This change order is to provide an additional $10,000 to the contract, which would cover up to 194 ft of rock <br />drilling. <br />Reason for Change: Rock is in the pathway of drilling to install conduit to hold Orange County Fiber. See Attachment A. <br />_______________________________________________________________________________________________________________ <br />Original contract sum: $ 307,070.14 <br />Contract sum prior to this change order: $ 364,628.26 <br />Amount of this change order: $ 10,000.00 <br />Total sum of the contract including this change order: $ 374,628.26 <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, <br />project, services, or work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 30th day of August, 2022. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br />By:____________________________ By:___________________________ By:___________________________ <br />DocuSign Envelope ID: 6884E077-E2E1-49CB-9160-FF791CF982BA <br />8/30/20228/30/2022 8/31/2022