Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />THERMAL INSULATION 072100 - 5 <br />a. AGM Industries, Inc.; RC150. <br />b. AGM Industries, Inc.; SC150. <br />c. Gemco; Dome-Cap. <br />d. Gemco; R-150. <br />e. Gemco; S-150. <br />2. Protect ends with capped self-locking washers incorporating a spring steel insert to ensure <br />permanent retention of cap in the following locations: <br />a. Ceiling plenums, <br />b. Underside of horizontal Concrete sections <br />c. Vertical Concrete wall sections <br />d. Where indicated. <br />D. Anchor Adhesive: Product with demonstrated capability to bond insulation anchors securely to <br />substrates indicated without damaging insulation, fasteners, and substrates. <br />1. Products: <br />a. AGM Industries, Inc.; TACTOO Adhesive. <br />b. Eckel Industries of Canada; Stic-Klip Type S Adhesive. <br />c. Gemco; Tuff Bond Hanger Adhesive. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates and conditions, with Installer present, for compliance with requirements of <br />Sections in which substrates and related work are specified and for other conditions affecting <br />performance. <br />1. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Clean substrates of substances harmful to insulation or vapor retarders, including removing <br />projections capable of puncturing vapor retarders or of interfering with insulation attachment. <br />3.3 INSTALLATION, GENERAL <br />A. Comply with insulation manufacturer's written instructions applicable to products and <br />application indicated. <br />B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any <br />time to ice, rain, and snow. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.