Orange County NC Website
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />THERMAL INSULATION 072100 - 2 <br />1.5 SUBMITTALS <br />A. Product Data: For each type of product indicated. <br />B. Samples for Verification: Full-size units for each type of exposed insulation indicated. <br />C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified <br />testing agency for insulation products. <br />D. Research/Evaluation Reports: For foam-plastic insulation. <br />1.6 QUALITY ASSURANCE <br />A. Source Limitations: Obtain each type of building insulation through one source from a single <br />manufacturer. <br />B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test- <br />response characteristics indicated, as determined by testing identical products per test method <br />indicated below by UL or another testing and inspecting agency acceptable to authorities having <br />jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting <br />agency. <br />1. Surface-Burning Characteristics: ASTM E 84. <br />2. Fire-Resistance Ratings: ASTM E 119. <br />3. Combustion Characteristics: ASTM E 136. <br />C. Recycled Content: Provide glass-fiber insulation with recycled content so postconsumer <br />recycled content plus one-half of Post consumer recycled content is not less than 60 percent. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, <br />and other sources. Store inside and in a dry location. Comply with manufacturer's written <br />instructions for handling, storing, and protecting during installation. <br />B. Protect plastic insulation as follows: <br />1. Do not expose to sunlight, except to extent necessary for period of installation and <br />concealment. <br />2. Protect against ignition at all times. Do not deliver plastic insulating materials to Project <br />site before installation time. <br />3. Complete installation and concealment of plastic materials as rapidly as possible in each <br />area of construction. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2