Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />INTERIOR ARCHITECTURAL WOODWORK 064023 - 11 <br />1. Backpriming: Apply one coat of sealer or primer, compatible with finish coats, to <br />concealed surfaces of woodwork. Apply two coats to back of paneling and to end-grain <br />surfaces. Concealed surfaces of plastic-laminate-clad woodwork do not require <br />backpriming when surfaced with plastic laminate, backing paper. <br />E. Transparent Finish: <br />1. Grade: Premium <br />2. AWI Finish System: Synthetic penetrating oil.. <br />3. AWI Finish System: Conversion varnish. <br />4. Open Finish for Open-Grain Woods: Do not apply filler to open-grain woods. <br /> Sheen: Satin, 31-45 gloss units measured on 60-degree gloss meter per ASTM D 523. <br />F. Opaque Finish: <br />1. Grade: Premium <br />2. AWI Finish System: Conversion varnish. <br />3. Color: Match ID sample or As selected by ID from manufacturer's full range. <br />4. Satin, 31-45 gloss units measured on 60-degree gloss meter per ASTM D 523. <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Before installation, condition woodwork to average prevailing humidity conditions in installation <br />areas. <br />B. Before installing architectural woodwork, examine shop-fabricated work for completion and <br />complete work as required, including removal of packing and backpriming. <br />3.2 INSTALLATION <br />A. Grade: Install woodwork to comply with requirements for the same grade specified in Part 2 for <br />fabrication of type of woodwork involved. <br />B. Assemble woodwork and complete fabrication at Project site to comply with requirements for <br />fabrication in Part 2, to extent that it was not completed in the shop. <br />C. Install woodwork level, plumb, true, and straight. Shim as required with concealed shims. Install <br />level and plumb (including tops) to a tolerance of 1/8 inch in 96 inches (3 mm in 2400 mm). <br />D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair damaged finish at <br />cuts <br />E. Fire-Retardant-Treated Wood: Handle, store, and install fire-retardant-treated wood to comply <br />with chemical treatment manufacturer's written instructions, including those for adhesives used <br />to install woodwork. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.