Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />INTERIOR ARCHITECTURAL WOODWORK 064023 - 4 <br />Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying <br />the Work. <br />1. Locate concealed framing, blocking, and reinforcements that support woodwork by field <br />measurements before being enclosed, and indicate measurements on Shop Drawings. <br />2. Established Dimensions: Where field measurements cannot be made without delaying <br />the Work, establish dimensions and proceed with fabricating woodwork without field <br />measurements. Provide allowance for trimming at site, and coordinate construction to <br />ensure that actual dimensions correspond to established dimensions. <br />1.8 COORDINATION <br />A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units <br />of Work specified in other Sections to ensure that interior architectural woodwork can be <br />supported and installed as indicated. <br />B. Hardware Coordination: Distribute copies of approved hardware schedule specified in Division 08 <br />Section "Door Hardware (Scheduled by Describing Products)" to fabricator of architectural <br />woodwork; coordinate Shop Drawings and fabrication with hardware requirements. <br />PART 2 - PRODUCTS <br />2.1 WOODWORK FABRICATORS <br />A. Available Fabricators: Subject to compliance with requirements, fabricators offering interior <br />architectural woodwork that may be incorporated into the Work include, but are not limited to, <br />the following: <br />1) Bertch Cabinets <br />2) Executive Kitchens <br />3) CKS <br />4) Ultracraft <br />5) Cleora Sterling <br />6) Aventine <br />7) MarKraft Cabinets <br />2.2 MATERIALS <br />A. General: Provide materials that comply with requirements of AWI's quality standard for each type <br />of woodwork and quality grade specified, unless otherwise indicated. <br />B. Wood Species and Cut for Transparent Finish: American Cherry, plain sawn, Maple, plain sawn, <br />Bamboo 3 ply <br />C. Wood Species for Opaque Finish: Any closed-grain hardwood, Eastern white pine <br />D. Wood Products: Comply with the following: <br /> <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.