Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />MISCELLANEOUS CAST-IN-PLACE CONCRETE 033053 - 6 <br />3.6 CONCRETE PLACEMENT <br />A. Comply with ACI 301 (ACI 301M) for placing concrete. <br />B. Before test sampling and placing concrete, water may be added at Project site, subject to <br />limitations of ACI 301 (ACI 301M). <br />C. Do not add water to concrete during delivery, at Project site, or during placement. <br />D. Consolidate concrete with mechanical vibrating equipment. <br />3.7 FINISHING FORMED SURFACES <br />A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes <br />and defective areas repaired and patched. Remove fins and other projections exceeding 1/2 inch <br />(13 mm). <br />1. Apply to concrete surfaces not exposed to public view. <br />B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in <br />an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and <br />defective areas. Remove fins and other projections exceeding 1/8 inch (3 mm). <br />1. Apply to concrete surfaces exposed to public view, or to be covered with a coating or <br />covering material applied directly to concrete. <br />C. Rubbed Finish: Apply the following rubbed finish, defined in ACI 301 (ACI 301M), to <br />smooth-formed finished as-cast concrete where indicated: <br />D. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces <br />adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent <br />formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent <br />unformed surfaces, unless otherwise indicated. <br />3.8 FINISHING UNFORMED SURFACES <br />A. General: Comply with ACI 302.1R for screeding, restraightening, and finishing operations for <br />concrete surfaces. Do not wet concrete surfaces. <br />B. Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or <br />darbies to form a uniform and open-textured surface plane before excess moisture or bleedwater <br />appears on surface. <br />1. Do not further disturb surfaces before starting finishing operations. <br />C. Scratch Finish: Apply scratch finish to surfaces indicated and surfaces to receive concrete floor <br />topping or mortar setting beds for ceramic or quarry tile, portland cement terrazzo, and other <br />bonded cementitious floor finishes, unless otherwise indicated. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.