Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU November 28, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br /> <br />VALUE ENGINEERING <br /> <br />NARRATIVE ON ACCEPTED VE ITEMS <br /> <br /> <br /> <br /> <br /> <br />ITEM <br /># <br />NARRATIVE AMOUNT <br />1 Eliminate tile demolition and major floor prep. excludes tile demo at bar. With <br />this VE item the tile in the lobby will be demolished allowing the lobby to retain <br />a consistent wood floor. At other locations, especially at the work room and hos- <br />pitality areas the tile floor will be cleaned. For finish changes to these other areas <br />see Item #2 below. <br />Deduct: <br />($4,200) <br />2 Add carpet in lieu of LVT at 006 Hospitality; 007 Storage; 010 Work Room; 014 <br />Utility; 015 Storage. With this VE item the tile will be cleaned and will remain in <br />place (see Item 1 above). Plywood sub-floor will be attached over the tile and <br />carpet installed in lieu of LVT. This change will be reflected on the Room Finish <br />Schedule on sheet A-701. <br />Deduct: <br />($630) <br />3 Metal framing in lieu of wood framing for walls. This change will eliminate wood <br />framing at new walls. Engineered wood beams remain as does miscellaneous <br />blocking and shimming. <br />Deduct: <br />($1,800) <br />4 Deleted <br />5 Keep existing water heater. The existing water heater located in the attic space <br />has functional capacity to satisfy demand. The existing water heater will be tested <br />to confirm output. <br />Deduct <br />($1,000) <br />6 Deleted <br /> <br /> <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.