Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />FIRE EXTINGUISHER CABINETS 104413 - 5 <br />B. Cabinet Doors: Fabricate doors according to manufacturer's standards, from materials indicated <br />and coordinated with cabinet types and trim styles selected. <br />1. Fabricate door frames with tubular stiles and rails and hollow-metal design, minimum 1/2 <br />inch (13 mm) thick. <br />2. Fabricate door frames of one-piece construction with edges flanged. <br />3. Miter and weld perimeter door frames. <br />C. Cabinet Trim: Fabricate cabinet trim in one piece with corners mitered, welded, and ground <br />smooth. <br />2.4 GENERAL FINISH REQUIREMENTS <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for <br />recommendations for applying and designating finishes. <br />B. Protect mechanical finishes on exposed surfaces of fire protection cabinets from damage by <br />applying a strippable, temporary protective covering before shipping. <br />C. Finish fire protection cabinets after assembly. <br />D. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. <br />Variations in appearance of adjoining components are acceptable if they are within the range of <br />approved Samples and are assembled or installed to minimize contrast. <br />2.5 ALUMINUM FINISHES <br />A. Baked-Enamel or Powder-Coat Finish: AAMA 2603 except with a minimum dry film thickness <br />of 1.5 mils (0.04 mm). Comply with coating manufacturer's written instructions for cleaning, <br />conversion coating, and applying and baking finish. <br />1. Color and Gloss: As selected by Architect from manufacturer's full range. <br />2.6 STEEL FINISHES <br />A. Baked-Enamel or Powder-Coat Finish: Immediately after cleaning and pretreating, apply <br />manufacturer's standard two-coat, baked-on finish consisting of prime coat and thermosetting <br />topcoat. Comply with coating manufacturer's written instructions for applying and baking to <br />achieve a minimum dry film thickness of 2 mils (0.05 mm). <br />1. Color and Gloss: As selected by Architect from manufacturer's full range. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.