Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />TOILET, BATH, AND LAUNDRY ACCESSORIES 102800 - 1 <br />SECTION 102800 – TOILET AND BATH ACCESSORIES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes the following: <br />1. Toilet Room accessories including electric hand dryers. <br />B. Related Sections include the following: <br />1.3 SUBMITTALS <br />A. Product Data: For each type of product indicated. Include the following: <br />1. Construction details and dimensions. <br />2. Anchoring and mounting requirements, including requirements for cutouts in other work <br />and substrate preparation. <br />3. Material and finish descriptions. <br />4. Features that will be included for Project. <br />5. Manufacturer's warranty. <br />B. Samples: Full size, for each accessory item to verify design, operation, and finish requirements. <br />1. Approved full-size Samples will be returned and may be used in the Work. <br />C. Product Schedule: Indicating types, quantities, sizes, and installation locations by room of each <br />accessory required. <br />1. Identify locations using room designations indicated on Drawings. <br />2. Identify products using designations indicated on Drawings. <br />D. Maintenance Data: For toilet and bath accessories to include in maintenance manuals. <br />1.4 QUALITY ASSURANCE <br />A. Source Limitations: For products listed together in the same articles in Part 2, provide products <br />of same manufacturer unless otherwise approved by Architect. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.