Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />INTERIOR GLASS PARTITION 102310 - 3 <br /> Door Configuration: As indicated on drawings. <br /> Height: 2 inch (51 mm). <br /> Length: 6-7/16 inch (164 mm). <br /> Cladding Finish: Satin anodized. <br /> Glass Thickness: 1/2 inch (12.7 mm), tempered. <br /> Door Hardware: Patch bottom fitting, brushed stainless steel. <br /> Provide accessories as required for complete installation. <br /> <br />2.2 EXECUTION <br /> A. Verify that field measurements are as indicated. <br /> B. Verify that track supports are properly braced, level within 1/4 inch (6 mm) of required <br /> position and parallel to the floor surface. <br /> C. Verify floor flatness of 1/8 inch in 10 feet (3 mm in 3 m), non-cumulative. <br /> D. Do not begin installation until supports and adjacent substrates have been properly prepared. <br /> E. If substrate preparation is the responsibility of another installer, notify Architect of <br /> unsatisfactory preparation before proceeding. <br /> <br />2.3 PREPARATION <br /> A. Clean substrates thoroughly prior to installation. <br /> B. Prepare substrates using the methods recommended by the manufacturer for achieving ac <br /> acceptable result for the substrate under the project conditions. <br /> <br />3.1 INSTALLATION <br /> A. Install in accordance with glazed interior wall and door assembly manufacturer's instructions. <br /> B. Fit and align glazed interior wall and door assembly level and plumb. <br /> <br />3.2 ADJUSTING <br /> A. Adjust glazed interior wall and door assembly to operate smoothly from sliding or pivoting <br /> positions. <br /> B. Adjust swing door hardware for smooth operation. <br /> <br />3.3 CLEANING <br /> A. Clean installed work to like-new condition. <br /> <br />4.1 CLOSEOUT ACTIVITIES <br /> A. See Section DESRIBING - Closeout Submittals, for closeout submittals. <br /> B. Demonstrate operation of glazed interior wall and door assembly and identify potential <br /> operational problems. <br /> <br />4.2 PROTECTION <br /> A. Protect installed products until completion of project. <br /> B. Touch-up, repair or replace damaged products before date of Substantial Completion. <br /> <br /> <br />END OF SECTION 102310 <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.