Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br /> <br />STAINING AND TRANSPARENT FINISHING 099300 - 2 <br />D. Product List: For each product indicated, include the following: <br />1. Cross-reference to finish system and locations of application areas. Use same <br />designations indicated on Drawings and in schedules. <br />2. Printout of MPI's current "MPI Approved Products List" for each product category <br />specified in Part 2, with the product proposed for use highlighted. <br />1.4 QUALITY ASSURANCE <br />A. MPI Standards: <br />1. Products: Complying with MPI standards indicated and listed in its "MPI Approved <br />Products List." <br />2. Preparation and Workmanship: Comply with requirements in "MPI Architectural <br />Painting Specification Manual" for products and finish systems indicated. <br />B. Mockups: Apply benchmark samples of each finish system indicated and each color selected to <br />verify preliminary selections made under sample submittals and to demonstrate aesthetic effects <br />and set quality standards for materials and execution. <br />1. Architect will select one surface to represent surfaces and conditions for application of <br />each type of finish system and substrate. <br />a. Vertical and Horizontal Surfaces: Provide samples of at least 10 sq. ft. <br />b. Other Items: Architect will designate items or areas required. <br />2. Final approval of stain color selections will be based on benchmark samples. <br />a. If preliminary stain color selections are not approved, apply additional benchmark <br />samples of additional stain colors selected by Architect at no added cost to Owner. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient <br />temperatures continuously maintained at not less than 45 deg F (7 deg C). <br />1. Maintain containers in clean condition, free of foreign materials and residue. <br />2. Remove rags and waste from storage areas daily. <br />1.6 PROJECT CONDITIONS <br />A. Apply finishes only when temperature of surfaces to be finished and ambient air temperatures <br />are between 50 and 95 deg F (10 and 35 deg C). <br />B. Do not apply exterior finishes in snow, rain, fog, or mist; when relative humidity exceeds 85 <br />percent; at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet <br />surfaces. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.