Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br /> <br />STAINING AND TRANSPARENT FINISHING 099300 - 1 <br />SECTION 099300 - STAINING AND TRANSPARENT FINISHING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes surface preparation and the application of wood finishes on the following <br />substrates: <br />1. Exterior Substrates: None in this bid. This specification is intended to apply if the Owner <br />elects to perform any exterior work in addition to this bid. <br />a. Dressed lumber (finish carpentry). <br />b. Exposed wood panel products. <br />c. Wood decks and stairs. <br />2. Interior Substrates: <br />a. Dressed lumber (finish carpentry). <br />b. Exposed wood panel products. <br />B. Related Sections include the following: <br />1. Division 09 wood flooring Sections for stains and transparent finishes applied to wood <br />flooring. <br />2. Division 09 Section "Exterior Painting" for surface preparation and application of <br />standard paint systems on exterior substrates. <br />3. Division 09 Section "Interior Painting" for surface preparation and application of <br />standard paint systems on interior substrates. <br />4. Division 09 painting Sections for special-use coatings. <br />1.3 SUBMITTALS <br />A. Product Data: For each type of product indicated. <br />B. Samples for Initial Selection: For each type of product indicated. <br />C. Samples for Verification: For each type of finish system and in each color and gloss of finish <br />indicated. <br />1. Submit Samples on representative samples of actual wood substrates, 8 inches (200 mm) <br />square. <br />2. Label each Sample for location and application area. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.