Orange County NC Website
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />INTERIOR PAINTING 099123 - 8 <br />3.5 CLEANING AND PROTECTION <br />A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from <br />Project site. <br />B. After completing paint application, clean spattered surfaces. Remove spattered paints by <br />washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. <br />C. Protect work of other trades against damage from paint application. Correct damage to work of <br />other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and <br />leave in an undamaged condition. <br />D. At completion of construction activities of other trades, touch up and restore damaged or <br />defaced painted surfaces. <br />3.6 INTERIOR PAINTING SCHEDULE <br />A. Concrete Substrates, Nontraffic Surfaces: <br />1. Latex Over Sealer System: MPI INT 3.1A. <br />a. Prime Coat: Interior latex primer/sealer. <br />b. Intermediate Coat: Interior latex matching topcoat. <br />c. Topcoat: Interior latex <br />B. CMU Substrates: <br />1. Latex System: MPI INT 4.2A. In Hallways, and all other spaces except D below. <br />a. Prime Coat: Interior/exterior latex block filler. <br />b. Intermediate Coat: Interior latex matching topcoat. <br />c. Topcoat: Interior latex semigloss. <br />C. Steel Substrates: <br />1. Quick-Drying Enamel System: MPI INT 5.1A. <br />a. Prime Coat: Quick-drying alkyd metal primer. <br />b. Intermediate Coat: Quick-drying enamel matching topcoat. <br />c. Topcoat: Quick-drying enamel (semigloss). <br />D. Galvanized-Metal Substrates: <br />1. Water-Based Dry-Fall System: MPI INT 5.3H. <br />a. Prime Coat: Waterborne dry fall. <br />b. Topcoat: Waterborne dry fall. <br />E. Aluminum (Not Anodized or Otherwise Coated) Substrates: <br />1. Latex System: MPI INT 5.4H. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2