Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />INTERIOR PAINTING 099123 - 7 <br />B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of <br />same material are to be applied. Tint undercoats to match color of topcoat, but provide <br />sufficient difference in shade of undercoats to distinguish each separate coat. <br />C. If undercoats or other conditions show through topcoat, apply additional coats until cured film <br />has a uniform paint finish, color, and appearance. <br />D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, <br />roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color <br />breaks. <br />E. Painting Mechanical and Electrical Work: Paint visible items in and occupied spaces including, <br />but not limited to, the following: <br />1. Mechanical Work: <br />a. Uninsulated metal piping. <br />b. Uninsulated plastic piping. <br />c. Pipe hangers and supports. <br />d. Tanks that do not have factory-applied final finishes. <br />e. Visible portions of internal surfaces of metal ducts, without liner, behind air inlets <br />and outlets. <br />f. Duct, equipment, and pipe insulation having cotton or canvas insulation covering <br />or other paintable jacket material. <br />g. Mechanical equipment that is indicated to have a factory-primed finish for field <br />painting. <br />2. Electrical Work: <br />a. Switchgear. <br />b. Panelboards. <br />c. Electrical equipment that is indicated to have a factory-primed finish for field <br />painting. <br />3.4 FIELD QUALITY CONTROL <br />A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure at any <br />time and as often as Owner deems necessary during the period when paints are being applied: <br />1. Owner will engage the services of a qualified testing agency to sample paint materials <br />being used. Samples of material delivered to Project site will be taken, identified, sealed, <br />and certified in presence of Contractor. <br />2. Testing agency will perform tests for compliance with product requirements. <br />3. Owner may direct Contractor to stop applying paints if test results show materials being <br />used do not comply with product requirements. Contractor shall remove noncomplying- <br />paint materials from Project site, pay for testing, and repaint surfaces painted with <br />rejected materials. Contractor will be required to remove rejected materials from <br />previously painted surfaces if, on repainting with complying materials, the two paints are <br />incompatible. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.