Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />SHEET CARPETING 096816 - 3 <br />C. Mockups: Before installing carpet, build mockups to verify selections made under sample <br />submittals and to demonstrate aesthetic effects and set quality standards for materials and <br />execution. <br />1. Approved mockups may become part of the completed Work if undisturbed at time of <br />Substantial Completion. <br />D. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br />Division 01 Section "Project Management and Coordination." <br />E. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br />Division 01 Section "Project Management and Coordination." Review methods and procedures <br />related to carpet installation including, but not limited to, the following: <br />1. Review delivery, storage, and handling procedures. <br />2. Review ambient conditions and ventilation procedures. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A. Comply with CRI 104, Section 5, "Storage and Handling." <br />1.6 PROJECT CONDITIONS <br />A. Comply with CRI 104, Section 7.2, "Site Conditions; Temperature and Humidity" and <br />Section 7.12, "Ventilation." <br />B. Environmental Limitations: Do not install carpet and carpet cushion until wet work in spaces <br />is complete and dry, and ambient temperature and humidity conditions are maintained at the <br />levels indicated for Project when occupied for its intended use. <br />C. Do not install carpet and carpet cushionover concrete slabs until slabs have cured, are <br />sufficiently dry to bond with adhesive, and have pH range recommended by carpet <br />manufacturer. <br />D. Where demountable partitions or other items are indicated for installation on top of carpet, <br />install carpet before installing these items. <br />1.7 WARRANTY <br />A. Special Warranty for Carpet: Manufacturer's standard form in which manufacturer agrees to <br />repair or replace components of carpet installation that fail in materials or workmanship within <br />specified warranty period. <br />1. Warranty does not include deterioration or failure of carpet due to unusual traffic, failure <br />of substrate, vandalism, or abuse. <br />2. Failures include, but are not limited to, more than 10 percent loss of face fiber, edge <br />raveling, snags, runs, loss of tuft bind strength, excess static discharge, and delamination. <br />3. Warranty Period: 10 years from date of Substantial Completion. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.