Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />LOUVERS AND VENTS 089000 - 7 <br />2.7 FINISHES, GENERAL <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for <br />recommendations for applying and designating finishes. <br />2.8 ALUMINUM FINISHES <br />A. Finish louvers after assembly. <br />B. Retain finishes in paragraphs below to suit Project. If retaining more than one, indicate location of each <br />on Drawings or by inserts. <br />C. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker. <br />2.9 GALVANIZED-STEEL SHEET FINISHES <br />A. Finish louvers after assembly. <br />B. Surface Preparation: Clean surfaces with nonpetroleum solvent so surfaces are free of oil and other <br />contaminants. After cleaning, apply a conversion coating suited to the organic coating to be applied <br />over it. Clean welds, mechanical connections, and abraded areas and repair according to ASTM A 780. <br />2.10 STAINLESS-STEEL SHEET FINISHES <br />A. Repair sheet finish by grinding and polishing irregularities, weld spatter, scratches, and forming marks <br />to match surrounding finish. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates and openings, with Installer present, for compliance with requirements for <br />installation tolerances and other conditions affecting performance. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Coordinate setting drawings, diagrams, templates, instructions, and directions for installation of <br />anchorages that are to be embedded in concrete or masonry construction. Coordinate delivery of such <br />items to Project site. <br />3.3 INSTALLATION <br />A. Locate and place louvers and vents level, plumb, and at indicated alignment with adjacent work. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.