Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />DOOR HARDWARE 087100 - 17 <br />2.17 FINISHES <br />A. Standard: Brushed Nickel.. <br />B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary <br />protective covering before shipping. <br />C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if <br />they are within one-half of the range of approved Samples. Noticeable variations in the same piece are <br />not acceptable. Variations in appearance of other components are acceptable if they are within the <br />range of approved Samples and are assembled or installed to minimize contrast. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine doors and frames, with Installer present, for compliance with requirements for installation <br />tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions <br />affecting performance. <br />B. Examine roughing-in for electrical power systems to verify actual locations of wiring connections <br />before electrified door hardware installation. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Steel Frames: Comply with DHI A115 Series. <br />1. Surface-Applied Door Hardware: Drill and tap doors and frames according to ANSI A250.6. <br />B. Wood Doors: Comply with DHI A115-W Series. <br />3.3 INSTALLATION <br />A. Mounting Heights: Mount door hardware units at heights indicated as follows unless otherwise <br />indicated or required to comply with governing regulations. <br />1. Standard Steel Doors and Frames: DHI's "Recommended Locations for Architectural Hardware <br />for Standard Steel Doors and Frames." <br />2. Custom Steel Doors and Frames: DHI's "Recommended Locations for Builders' Hardware for <br />Custom Steel Doors and Frames." <br />3. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for Wood <br />Flush Doors." <br />B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and <br />fitting are required to install door hardware onto or into surfaces that are later to be painted or finished <br />in another way, coordinate removal, storage, and reinstallation of surface protective trim units with <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.