Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />DOOR HARDWARE 087100 - 5 <br />a. Exit Devices: Two years from date of Substantial Completion. <br />b. Manual Closers: Ten years from date of Substantial Completion. <br />1.9 MAINTENANCE SERVICE <br />A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance <br />instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of <br />door hardware. <br />B. Maintenance Service: Beginning at Substantial Completion, provide twelve months' full maintenance <br />by skilled employees of door hardware Installer. Include quarterly preventive maintenance, repair or <br />replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper <br />door hardware operation. Provide parts and supplies same as those used in the manufacture and <br />installation of original products. <br />PART 2 - PRODUCTS <br />2.1 SCHEDULED DOOR HARDWARE <br />A. General: Provide door hardware for each door to comply with requirements in this Section and door <br />hardware sets indicated in door and frame schedule. <br />1. Door Hardware Sets: Provide quantity, item, size, finish or color indicated, and named <br />manufacturers' products or equal as approved by the Architect. <br />2. Sequence of Operation: Provide electrified door hardware function, sequence of operation, and <br />interface with other building control systems indicated. <br />B. Designations: Requirements for design, grade, function, finish, size, and other distinctive qualities of <br />each type of door hardware are indicated in Part 3 "Door Hardware Sets" Article. Products are <br />identified by using door hardware designations, as follows: <br />1. Named Manufacturers' Products: Manufacturer and product designation are listed for each door <br />hardware type required for the purpose of establishing minimum requirements. Manufacturers' <br />names are abbreviated in Part 3 "Door Hardware Sets" Article. <br />2. References to BHMA Standards: Provide products complying with these standards and <br />requirements for description, quality, and function. <br />C. In other Part 2 articles where titles below introduce lists, the following requirements apply to product <br />selection: <br />1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering <br />products that may be incorporated into the Work include, but are not limited to, manufacturers <br />specified. <br />2. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers <br />specified. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.