Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />DOOR HARDWARE 087100 - 4 <br />Contractor, and Architect, conference participants shall also include Installer's Architectural Hardware <br />Consultant and Owner's security consultant. Incorporate keying conference decisions into final keying <br />schedule after reviewing door hardware keying system including, but not limited to, the following: <br />1. Function of building, flow of traffic, purpose of each area, degree of security required, and plans <br />for future expansion. <br />2. Preliminary key system schematic diagram. <br />3. Requirements for key control system. <br />4. Address for delivery of keys. <br /> <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Inventory door hardware on receipt and provide secure lock-up for door hardware delivered to Project <br />site. <br />B. Tag each item or package separately with identification related to the final door hardware sets, and <br />include basic installation instructions, templates, and necessary fasteners with each item or package. <br />C. Deliver keys to manufacturer of key control system for subsequent delivery to Owner. <br />D. Deliver keys and permanent cores to Owner by registered mail or overnight package service. <br />1. Name and address of Owner's representative to be determined. <br />1.7 COORDINATION <br />A. Templates: Distribute door hardware templates for doors, frames, and other work specified to be <br />factory prepared for installing door hardware. Check Shop Drawings of other work to confirm that <br />adequate provisions are made for locating and installing door hardware to comply with indicated <br />requirements. <br />B. Electrical System Roughing-in: Coordinate layout and installation of electrified door hardware with <br />connections to power supplies, fire alarm system and detection devices, access control system, security <br />system, building control system. <br />1.8 WARRANTY <br />A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace <br />components of door hardware that fail in materials or workmanship within specified warranty period. <br />1. Failures include, but are not limited to, the following: <br />a. Structural failures including excessive deflection, cracking, or breakage. <br />b. Faulty operation of operators and door hardware. <br />c. Deterioration of metals, metal finishes, and other materials beyond normal weathering and <br />use. <br />2. Warranty Period: Three years from date of Substantial Completion, except as follows: <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.