Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />DOOR HARDWARE 087100 - 3 <br />5) Location of each door hardware set, cross-referenced to Drawings, both on floor <br />plans and in door and frame schedule. <br />6) Explanation of abbreviations, symbols, and codes contained in schedule. <br />7) Mounting locations for door hardware. <br />8) Door and frame sizes and materials. <br />9) Description of each electrified door hardware function, including location, sequence <br />of operation, and interface with other building control systems. <br />a) Sequence of Operation: Include description of component functions that <br />occur in the following situations: authorized person wants to enter; <br />authorized person wants to exit; unauthorized person wants to enter; <br />unauthorized person wants to exit. <br />10) List of related door devices specified in other Sections for each door and frame. <br />d. Submittal Sequence: Submit the final door hardware sets at earliest possible date, <br />particularly where approval of the door hardware sets must precede fabrication of other <br />work that is critical in Project construction schedule. Include Product Data, Samples, Shop <br />Drawings of other work affected by door hardware, and other information essential to the <br />coordinated review of the door hardware sets. <br />e. Submittal Sequence: Submit initial draft of final schedule along with essential Product <br />Data to facilitate the fabrication of other work that is critical in Project construction <br />schedule. Submit the final door hardware sets after Samples, Product Data, coordination <br />with Shop Drawings of other work, delivery schedules, and similar information has been <br />completed and accepted. <br />2. Keying Schedule: Prepared by or under the supervision of Architectural Hardware Consultant, <br />detailing Owner's final keying instructions for locks. Include schematic keying diagram and <br />index each key set to unique door designations. <br />1.5 QUALITY ASSURANCE <br />A. Installer Qualifications: An employer of workers trained and approved by lock manufacturer. <br />1. Installer's responsibilities include supplying and installing door hardware and providing a <br />qualified Architectural Hardware Consultant available during the course of the Work to consult <br />with Contractor, Architect, and Owner about door hardware and keying. <br />2. Installer shall have warehousing facilities in Project's vicinity. <br />3. Scheduling Responsibility: Preparation of door hardware and keying schedules. <br />4. Engineering Responsibility: Preparation of data for electrified door hardware, including Shop <br />Drawings, based on testing and engineering analysis of manufacturer's standard units in <br />assemblies similar to those indicated for this Project. <br />B. Architectural Hardware Consultant Qualifications: A person who is currently certified by DHI as an <br />Architectural Hardware Consultant and who is experienced in providing consulting services for door <br />hardware installations that are comparable in material, design, and extent to that indicated for this <br />Project. <br />C. Keying Conference: Conduct conference at Project site to comply with requirements in Division 01 <br />Section "Project Management and Coordination." In addition to Owner, Construction Manager, <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.