Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />DOOR HARDWARE 087100 - 2 <br />1.4 SUBMITTALS <br />A. Product Data: Include construction and installation details, material descriptions, dimensions of <br />individual components and profiles, and finishes. <br />B. Samples for Initial Selection: For each finish, color, and texture required for each type of door <br />hardware indicated. <br />C. Samples for Verification: Submit minimum 2-by-4-inch (51-by-102-mm) plate Samples of each type of <br />finish required, except primed finish. <br />D. Samples for Verification: For exposed door hardware of each type, in specified finish, full size. Tag <br />with full description for coordination with the door hardware sets. Submit Samples before, or <br />concurrent with, submission of the final door hardware sets. <br />1. Samples will be returned to Contractor. Units that are acceptable and remain undamaged through <br />submittal, review, and field comparison process may, after final check of operation, be <br />incorporated into the Work, within limitations of keying requirements. <br />E. Qualification Data: For installer. <br />F. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and <br />witnessed by a qualified testing agency, for locks, latches, delayed-egress locks, and closers. <br />G. Maintenance Data: For each type of door hardware to include in maintenance manuals. Include final <br />hardware and keying schedule. <br />H. Warranty: Special warranty specified in this Section. <br />I. Other Action Submittals: <br />1. Door Hardware Sets: Prepared by or under the supervision of Architectural Hardware <br />Consultant, detailing fabrication and assembly of door hardware, as well as procedures and <br />diagrams. Coordinate the final door hardware sets with doors, frames, and related work to ensure <br />proper size, thickness, hand, function, and finish of door hardware. <br />a. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and <br />Format for the Hardware Schedule." Double space entries, and number and date each <br />page. <br />b. Format: Use same scheduling sequence and format and use same door numbers as in the <br />Contract Documents. <br />c. Content: Include the following information: <br />1) Identification number, location, hand, fire rating, and material of each door and <br />frame. <br />2) Type, style, function, size, quantity, and finish of each door hardware item. Include <br />description and function of each lockset and exit device. <br />3) Complete designations of every item required for each door or opening including <br />name and manufacturer. <br />4) Fastenings and other pertinent information. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.