Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br />DOOR HARDWARE 087100 - 1 <br />SECTION 087100 - DOOR HARDWARE <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes the following: <br />1. Commercial door hardware for the following: <br />a. Swinging doors. <br />b. Non-fire-rated folding doors. <br />c. Doors to the exterior. <br />d. Other doors to the extent indicated. <br />B. Related Sections include the following: <br />1. Division 08 Section "Hollow Metal Doors and Frames" for astragals provided as part of fire-rated <br />labeled assemblies and door silencers. <br />2. See Door Hardware Allowance. <br />1.3 DOOR HARDWARE ALLOWANCE <br />A. Door Hardware Selection: Furnish door hardware selected by Architect, in quantities specified in this <br />Section and in Division 01 Section "Allowances." <br />B. Allowance Bidding: After Architect selects door hardware and issues the door hardware sets, request <br />bids for products and materials. <br />C. Allowance Award: Architect will select bid from bids furnished by Contractor. Award purchase order <br />to bidder selected. <br />D. Allowance Adjustment: A Change Order will be issued to adjust difference between door hardware <br />allowance and selected bid from door hardware Installer. <br />E. Installation: General types and approximate quantities of door hardware are indicated in the list of door <br />hardware sets to provide a basis for the cost of installation and other Work that is part of the Contract <br />Sum but not included in door hardware allowance. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.