Orange County NC Website
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />WOOD DOORS 081416 - 6 <br />3.2 INSTALLATION <br />A. Hardware: For installation, see Division 08 Section "Door Hardware." <br />B. Installation Instructions: Install doors to comply with manufacturer's written instructions and <br />the referenced quality standard, and as indicated. <br />1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80. <br />C. Job-Fitted Doors: Align and fit doors in frames with uniform clearances and bevels as indicated <br />below; do not trim stiles and rails in excess of limits set by manufacturer or permitted for fire- <br />rated doors. Machine doors for hardware. Seal edges of doors, edges of cutouts, and mortises <br />after fitting and machining. <br />1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors. <br />Provide 1 inch from bottom of door to top of decorative floor finish or covering unless <br />otherwise indicated. Where threshold is shown or scheduled, provide 1 inch (6.4 mm) <br />from bottom of door to top of threshold unless otherwise indicated. <br />2. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock and hinge edges. <br />. <br />D. Factory-Fitted Doors: Align in frames for uniform clearance at each edge. <br />E. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at <br />Project site. <br />3.3 ADJUSTING <br />A. Operation: Rehang or replace doors that do not swing or operate freely. <br />B. Finished Doors: Replace doors that are damaged or that do not comply with requirements. <br />Doors may be repaired or refinished if work complies with requirements and shows no evidence <br />of repair or refinishing. <br />END OF SECTION 081416 <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2